ArusGridOperator
Directory › Operators › NEXTDC

NEXTDC data center projects

Malaysia and Thailand · dataset updated 2026-10-18

ArusGrid tracks 2 active data center projects operated by NEXTDC, with 65 MW of planned IT load, across Malaysia and Thailand. Of these, 1 is operational and expanding and 1 is announced only. Disclosed running capacity is 10 MW.

ArusGrid classes the operator as colocation. The largest project is NEXTDC KL1 at 65 MW in Klang Valley, operational and expanding. No tenant is disclosed at any of its projects, which is normal for colocation and says nothing about occupancy.

Open the mapRelationship graph

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
NEXTDC KL1Petaling JayaExpanding65 *10NEXTDCLikely
NEXTDC Bangkok (BKK1)Bangkok (north/north-east fringe)Announcednone publishedundisclosedNEXTDCLikely

Markets where it builds

Firms it has used designers, builders and advisers on record

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.