NEXTDC KL1 data center

Petaling Jaya, Selangor, Malaysia · Klang Valley market · location approximate to district level

NEXTDC KL1 is a data center project in Petaling Jaya, Malaysia, operated by NEXTDC. It is operational and expanding. The published capacity figure is 65 MW, and its basis is not stated as IT load. The operator reports 10 MW running.

Latest change on record: moved to expanding on 27 August 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
65 MW
unstated
Running now
10 MW
Operators rarely publish this
Operator
NEXTDC
Colocation
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and NEXTDC KL1 ranks 9th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

NEXTDC has 1 project elsewhere in the dataset tracked by ArusGrid, including NEXTDC Bangkok (BKK1). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 10 MW is operational with a 2026 target; Phase 2 at 15 MW is under construction; Phase 3 (in plan) at 15 MW is announced. The dated record runs from under construction on 9 June 2023 to operational and expanding on 27 August 2026. The money on record is A$1,000m (about US$650m) as of May 2026, the announced investment.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 27 August 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

AI-ready marketing; first Uptime Tier IV cert in Peninsular MY; 2026 greenfield by listed AU operator

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Operational10 MW, target 2026
Phase 2 · Under construction15 MW
Phase 3 (in plan) · Announced15 MW
Remaining marketed capacity · Announced25 MW

Stage history

2023-06-09Under construction · crnasia.com
2026-05-14Operational · w.media
2026-08-27Expanding · announcements.asx.com.au

Who is behind it

OperatorNEXTDC · Colocation

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-05A$1,000m (about US$650m)

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorPembinaan Mitrajaya Sdn Bhd · RM375.5m (≈US$85m) · Jan 2025 Reported source ↗
KL1 main works: Stage 1 Ph2, Stage 2, Stage 3 Ph1 (original award)
Main contractorPembinaan Mitrajaya Sdn Bhd · RM426.3m (≈US$96m) · Sep 2025 Reported source ↗
KL1 variation orders adding later phases; contract to RM801.8m, complete Apr 2026
Main contractorPembinaan Mitrajaya Sdn Bhd · RM42.81m (≈US$10m) · Jan 2026 Reported source ↗
Fourth VO, Phase 3 Stage 1; contract to RM844.66m, complete Jul 2026
Piling and earthworksPembinaan Mitrajaya Sdn Bhd · RM54m (≈US$12m) · Mar 2026 Reported source ↗
KL1 Stage 4 early works (ST4-GC01), to Oct 2026

Sources checked 2026-10-22

  1. nextdc.com
  2. datacenterdynamics.com
  3. NEXTDC FY26 results ASX release (NEXTDC / ASX, 2026-08-27)
  4. NEXTDC launches 65MW AI data center in Malaysia; marks expansion into Southeast Asia (W.Media, 2026-05-15)
  5. NEXTDC Expands Contracted Utilisation; KL1 Malaysia Facility Secures Hyperscale Customer (Kalkine Media, 2025-06-10)
  6. NEXTDC launches first overseas data center in Kuala Lumpur (CRN Asia, 2026-05-15)
  7. NEXTDC launched its first Southeast Asia data centre in Kuala Lumpur (TechWire Asia, 2026-05-15)

More in Klang Valley

Also run by NEXTDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.