ArusGridProject
Directory › Malaysia › Klang Valley › Bridge Data Centres MY01/MY02

Bridge Data Centres MY01/MY02

Cyberjaya, Selangor, Malaysia · Klang Valley market · location approximate to city level

Bridge Data Centres MY01/MY02 is a data center project in Cyberjaya, Malaysia, operated by Bridge Data Centres (Chindata). It is operational and expanding. It is planned for 107 MW of IT load. The operator reports 20 MW running.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
107 MW
Running now
20 MW
Operators rarely publish this
Operator
Bridge Data Centres (Chindata)
Colocation
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Bridge Data Centres MY01/MY02 ranks 6th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

Bridge Data Centres has 5 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres MY07, Bridge Data Centres MY06 and Bridge Data Centres MY03. It sits on the Bridge Cyberjaya campus. Named funding comes from Bain Capital on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The build is phased. MY01+MY02 existing at 20 MW is operational; MY02 expansion Phase 1 is under construction with a 2026 target; MY02 expansion Phases 2 and 3 is announced. Power comes from Not named through grid supply at 132 kV.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 24 December 2025, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusUnlikely

legacy pre-2020 enterprise colo

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

MY01+MY02 existing · Operational20 MW
MY02 expansion Phase 1 · Under constructionSize not published, target 2026
MY02 expansion Phases 2 and 3 · AnnouncedSize not published

Who is behind it

OperatorBridge Data Centres (Chindata) · Colocation
Funder, EquityBain Capital

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

ArusGrid estimate, building costabout US$1.0bn to US$1.4bn

No figure has been announced. This range is 107 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerCyberview Sdn Bhd · Feb 2024 Reported source ↗
Sale and purchase agreement for the MY02 site only; MY01 land not covered.
Power supply
Grid supplyNot named · 132kV Confirmed source ↗
Bridge's Malaysia page gives MY01 and MY02 a power intake of 33 / 132kV. · Applies to the whole campus.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM72.84m · Sep 2026 source ↗
This project is one of 2 that fit. The other is Global Data Infrastructure Kota Seri Langat.

Sources checked 2026-10-22

  1. bridgedatacentres.com
  2. Bridge Data Centre Expands With Third Hyperscale Data Centre In Cyberjaya (BusinessToday, 2024-02-29)
  3. BRIDGE DATA CENTRES @ CYBERJAYA - DATA CENTRE (MY02) (DESIGN AND BUILD) (PHASE 1) (myBina (BCI), 2025-12-24)
  4. Bridge Data to build its largest data centre in Malaysia (MIDA, 2024-02-29)
  5. Malaysia | Bridge Data Centres (Bridge Data Centres)
  6. Acquisition of land in Cyberjaya, Selangor for Bridge Data Centres’ development of third data centre, MY02 (Rahmat Lim & Partners, 2025-07-25)

More in Klang Valley

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.