Bridge Data Centres MY01/MY02 is a data center project in Cyberjaya, Malaysia, operated by Bridge Data Centres (Chindata). It is operational and expanding. It is planned for 107 MW of IT load. The operator reports 20 MW running.
Record last checked against its sources on 22 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Bridge Data Centres MY01/MY02 ranks 6th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.
Bridge Data Centres has 5 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres MY07, Bridge Data Centres MY06 and Bridge Data Centres MY03. It sits on the Bridge Cyberjaya campus. Named funding comes from Bain Capital on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The build is phased. MY01+MY02 existing at 20 MW is operational; MY02 expansion Phase 1 is under construction with a 2026 target; MY02 expansion Phases 2 and 3 is announced. Power comes from Not named through grid supply at 132 kV.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 24 December 2025, and last checked the record on 22 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
legacy pre-2020 enterprise colo
A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No figure has been announced. This range is 107 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.
Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.