ArusGridProject
Directory › Malaysia › Johor › Bridge Data Centres Plentong

Bridge Data Centres Plentong

Plentong, Johor, Malaysia · Johor market · location approximate to district level

Bridge Data Centres Plentong is a data center project in Plentong, Malaysia, operated by Bridge Data Centres (Malaysia IV). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 13 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Bridge Data Centres (Malaysia IV)
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Bridge Data Centres Plentong has no published figure so it sits outside that ranking. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Bridge Data Centres has 5 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres MY07, Bridge Data Centres MY06 and Bridge Data Centres MY01/MY02. It sits on the Plentong, Johor Bahru campus. Named funding comes from Bain Capital on the equity side. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is RM337.3m (about US$76m) as of August 2024, the announced investment.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 18 December 2024, and last checked the record on 13 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorBridge Data Centres (Malaysia IV) · Colocation
Funder, EquityBain Capital

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2024-08RM337.3m (about US$76m)

The figure covers land only.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerParagon Globe Bhd · 47.86 acres · RM238.32m (≈US$54m) · freehold · May 2024 Confirmed source ↗
Plentong, Johor Bahru; buyer Bridge Data Centres Malaysia IV Sdn Bhd
Land sellerParagon Globe Bhd (Paragon Business Hub Sdn Bhd) · 19.759 acres · RM98.98m (≈US$22m) · freehold · Aug 2024 Confirmed source ↗
Adjacent parcel, Plentong (Geran 80943 Lot 2699); buyer Bridge Data Centres Malaysia IV Sdn Bhd

Sources checked 2026-10-13

  1. datacenterdynamics.com
  2. theedgemalaysia.com
  3. Bain-Backed Bridge Data Centres Signs 400MW Power Deal for New Malaysia Facility (Mingtiandi, 2024-12-04)
  4. Paragon Globe gains traction as beneficiary of data centre boom (The Edge Malaysia, 2024-12-18)

More in Johor

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.