DayOne Nusajaya Tech Park Campus

Iskandar Puteri, Johor, Malaysia · Johor market · location approximate to district level

DayOne Nusajaya Tech Park Campus is a data center project in Iskandar Puteri, Malaysia, operated by DayOne (ex-GDS International). It is operational and expanding. The operator has not published a capacity figure, and ArusGrid does not estimate one. The operator reports 460 MW running.

Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
Not published
Derived by ArusGrid
Running now
460 MW
Operators rarely publish this
Operator
DayOne (ex-GDS International)
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and DayOne Nusajaya Tech Park Campus has no published figure so it sits outside that ranking. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

DayOne has 4 others in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including DayOne Gerbang Nusajaya (Tanjung Kupang), DayOne Kempas Tech Park Campus and DayOne Kapar Campus (land assembly). It sits on the DayOne NTP campus. Named funding comes from Hillhouse Investment and Boyu Capital on the equity side. Named users of the compute are ByteDance and Oracle (reported, unconfirmed).

The money on record is RM1.38bn (about US$330m) as of April 2022, the announced investment. Power comes from TNB Renewables Sdn Bhd through a renewable power purchase agreement.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 6 October 2026, and last checked the record on 17 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

liquid-cooling capable per operator

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (NTP1-3) · Operational70 MW, target 2023

Who is behind it

OperatorDayOne (ex-GDS International) · Colocation
Funder, EquityHillhouse Investment
Funder, EquityBoyu Capital
Funder, DebtBank syndicate (US$3.6B Johor loan, 2025)

Who uses the compute

Tenant · hyperscalerByteDance · reported, unconfirmed
Tenant · hyperscalerOracle · reported, unconfirmed

Money at this site

Announced investment, 2022-04RM1.38bn (about US$330m)

The figure covers the whole campus.

Platform deals that include it

DayOne Johor syndicated financing
Platform capital, 2025-06
US$3.6bn
GDS Johor 10-year commitment
Country programme, 2021-08
US$981m
DayOne Series C
Platform capital, 2026-06-05
US$4.5bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Power supply
Renewable power dealTNB Renewables Sdn Bhd · 500 MW · Jun 2025 Confirmed source ↗
CRESS, TNB-developed solar, 21-year term · Platform deal covering DayOne NTP and KTP campuses · Covers the operator's wider portfolio in this country, not this site alone.
Renewable power dealTenaga Nasional Berhad (TNB) / TNB Renewables · Jun 2026 Confirmed source ↗
Over 1GW RE: ~1.5GWp ground-mounted and hybrid hydro floating solar plus 2.2GWh BESS, with RECs · Platform deal covering NTP and KTP; builds on June 2025 500MW CRESS · Covers the operator's wider portfolio in this country, not this site alone.
Virtual renewable dealCenergi SEA · 22.5 MW · Feb 2024 Reported source ↗
22.5MWac of a 29.99MWac solar farm under CGPP, 21 years · Signed by GDS (DayOne predecessor) for NTP
Grid supplyTenaga Nasional Berhad (TNB) · 85.5 MW · Oct 2022 Reported source ↗
ESA Oct 2022; 16MW interim supply from Jul 2023, max demand rising to 85.5MW

Sources checked 2026-10-17

  1. datacentermap.com
  2. w.media
  3. dayonedc.com
  4. Form F-1 (DayOne Data Centers Limited) (SEC EDGAR, 2026-10-05)
  5. DayOne IPO: Data center firm targets 2.3GW capacity by 2028 (DatacenterDynamics, 2026-10-06)

More in Johor

Also run by DayOne

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.