ArusGridProject
Directory › Malaysia › Klang Valley › DayOne Kapar Campus (land assembly)

DayOne Kapar Campus (land assembly)

Kapar, Klang, Selangor, Malaysia · Klang Valley market · location approximate to city level

Also listed as DayOne data center Kapar Klang and Kapar data center.

DayOne Kapar Campus (land assembly) is a data center project in Kapar, Klang, Malaysia, operated by DayOne Data Centers (ex-GDS International). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
DayOne Data Centers (ex-GDS International)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Long shot1 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and DayOne Kapar Campus (land assembly) has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

DayOne has 4 others in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including DayOne Gerbang Nusajaya (Tanjung Kupang), DayOne Kempas Tech Park Campus and DayOne Nusajaya Tech Park Campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is RM687.89m (about US$162m) as of July 2026, the announced investment.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 5 October 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

GPU/liquid-cooling positioning (press)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorDayOne Data Centers (ex-GDS International) · Colocation

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-07RM687.89m (about US$162m)

The figure covers land only.

Platform deals that include it

DayOne Series C
Platform capital, 2026-06-05
US$4.5bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerMaybulk Bhd (MBC Logistic Hub Sdn Bhd) · 58.03 acres · RM278.05m (≈US$63m) · freehold · Mar 2026 Confirmed source ↗
Mukim Kapar, Klang; buyer WG Malaysia VIII Sdn Bhd (DayOne SPV); part of ~157-acre RM687.89m assembly; EGMs Jul 2026
Land sellerEonmetall Group Bhd (Eonmetall Land Sdn Bhd) · 66.03 acres · RM273.28m (≈US$62m) · freehold · Mar 2026 Confirmed source ↗
Mukim Kapar, Klang; buyer WG Malaysia VIII Sdn Bhd (DayOne SPV); part of ~157-acre RM687.89m assembly; EGMs Jul 2026
Land sellerLeader Steel Holdings Bhd (FerroNet Asia Sdn Bhd) · 33 acres · RM136.56m (≈US$31m) · freehold · Mar 2026 Reported source ↗
Mukim Kapar, Klang; buyer WG Malaysia VIII Sdn Bhd (DayOne SPV); part of ~157-acre RM687.89m assembly; EGMs Jul 2026

Sources checked 2026-10-20

  1. edgeprop.my
  2. baxtel.com
  3. DayOne Form F-1 (SEC, 2026-10-05)
  4. Leader Steel shareholders approve RM136.6 mil Klang land disposal (EdgeProp, 2026-07-23)
  5. Maybulk to buy Klang industrial property for RM35.5m (EdgeProp, 2026-09-23)

More in Klang Valley

Also run by DayOne

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.