Directory › Malaysia › Klang Valley › Exsim Sri Permaisuri Data Centre (Cheras)

Exsim Sri Permaisuri Data Centre (Cheras)

Bandar Sri Permaisuri (Cheras), Kuala Lumpur, Malaysia · Klang Valley market · location approximate to district level

Exsim Sri Permaisuri Data Centre (Cheras) is a data center project in Bandar Sri Permaisuri (Cheras), Malaysia, operated by Exsim Sri Permai Sdn Bhd (Exsim Group). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as under construction on 19 February 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Exsim Sri Permai Sdn Bhd (Exsim Group)
Local developer
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Exsim Sri Permaisuri Data Centre (Cheras) has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

It is the only Exsim project ArusGrid tracks. It sits on the Exsim Sri Permai campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 is under construction with a 2027 target; Phase 2 is announced with a 2028 target. The stage was recorded as under construction on 19 February 2026.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 13 July 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Under constructionSize not published, target 2027
Phase 2 · AnnouncedSize not published, target 2028

Stage history

2026-02-19Under construction · thestar.com.my

Who is behind it

OperatorExsim Sri Permai Sdn Bhd (Exsim Group) · Local developer

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Design and build contractorBinastra Builders Sdn Bhd · RM503m (≈US$124m) · Feb 2026 Confirmed source ↗
Phase 1 turnkey seven-storey data centre, including foundation, sub-structure, main building and infrastructure works. 20 months from 19 Feb 2026.
Design and build contractorBinastra Builders Sdn Bhd · RM491.16m (≈US$121m) · Jul 2026 Confirmed source ↗
Phase 2 seven-storey data centre on adjacent plot. 18 months from 1 Jul 2026.

Sources checked 2026-10-22

  1. Binastra bags RM503 mil data centre job in KL (The Edge Malaysia, 2026-02-04)
  2. Binastra bags second KL data centre job worth RM491 mil (The Edge Malaysia, 2026-07-01)
  3. Binastra bags RM491mil data centre project (The Star, 2026-07-02)
  4. Firm bags US$240 million deal for construction of Phases 1 & 2 Kuala Lumpur DC (W.Media, 2026-07-13)

More in Klang Valley

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.