Google (Pearl Computing) Elmina Data Centre & Cloud Region is a data center project in City of Elmina, Shah Alam, Malaysia, operated by Google (via Pearl Computing). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Google (via Pearl Computing)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Strong7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started
Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Google (Pearl Computing) Elmina Data Centre & Cloud Region has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

Google has 4 others in Malaysia and 4 projects elsewhere in the dataset tracked by ArusGrid, including Google (Pearl Computing) Port Dickson, Google (Pearl Computing) Puncak Alam and Google (reported) Serendah Campus. It sits on the Elmina Business Park alongside Google Elmina 2 (SDP EBP Asset II). The named user of the compute is Google (Pearl Computing Malaysia Sdn Bhd) (confirmed).

The build is phased. Phase 1 (49 acres) is under construction with a 2027 target; Phase 2 (77 acres, RM5.6bn) is under construction with a 2027 target. Power comes from TotalEnergies / MK Land (via TNB grid) through a renewable power purchase agreement.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 20 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

hyperscaler self-build 2024+ (AI-era)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (49 acres) · Under constructionSize not published, target 2027
Phase 2 (77 acres, RM5.6bn) · Under constructionSize not published, target 2027

Who is behind it

OperatorGoogle (via Pearl Computing) · Hyperscaler self-build

Who uses the compute

Own use · hyperscalerGoogle (Pearl Computing Malaysia Sdn Bhd) · confirmed

Full facility, 49 acres, 20-year lease, rent up to RM2bn · as of 2024-05-23

Sime Darby Property's Bursa announcement 'Agreement to Build & Lease a Hyperscale Data Centre and Associated Structures' names the lessee as Pearl Computing Malaysia Sdn Bhd, wholly owned by Raiden APAC Pte Ltd, Singapore, for about 49 acres at Elmina Business Park, 20 years plus two 5-year options. Google's ownership of Pearl Computing is stated in EcoWorld's later Bursa filing ('an affiliate of Google') and by DCD; Gamuda's RM1.74bn award release names the same lessee.

Source · Agreement to Build & Lease a Hyperscale Data Centre and Associated Structures (Sime Darby Property Berhad (Bursa announcement), 2024-05-23)

Source · Gamuda wins RM1.74 bil job to build Sime Darby Property's hyperscale data centre at Elmina Business Park (Gamuda Berhad, 2024-05-24)

Platform deals that include it

Google Malaysia program
Country programme, 2024-05
US$2.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

Build-to-suit lease on record, grade ANo per kW figure

Sime Darby Property build-and-lease to Pearl Computing (Google), RM2bn over the first 20 years, two 5-year options Electricity excluded. As of 2024-05. Sime Darby Property, 2024-05-23

About RM100m a year on a build cost reported at about RM815m, a 12 percent gross yield on cost. Shell rent, MW not disclosed. Own-use site, so no colocation price applies.

An own-use build. No colocation price applies.

Project team
Core and shell builderGamuda Engineering · RM815m (≈US$183m) · May 2024 Confirmed source ↗
Phase 1 construction and commissioning
Core and shell builderIJM Construction · RM1.26bn (≈US$284m) · Oct 2025 Confirmed source ↗
Phase 2 core and shell, package 1
Core and shell builderIJM Construction · RM658m (≈US$148m) · Apr 2026 Reported source ↗
Package 2 main building works
Civil and structural worksAsteel (Sarawak) Sdn Bhd (with Sarnatec Sdn Bhd) · RM61.2m (≈US$14m) · Aug 2024 Reported source ↗
Roof and wall cladding, EBP1A hyperscale DC, subcontract to Gamuda; 15 months from 2024-08-12
Mechanical and electrical worksGamuda Engineering · RM928.6m (≈US$209m) · May 2024 Confirmed source ↗
Phase 1 M&E fit-out
Mechanical and electrical worksIJM Construction · RM873.9m (≈US$197m) · Oct 2025 Confirmed source ↗
Phase 2 M&E fit-out, package 1
Land
LandlordSime Darby Property · 126 acres · leased · Dec 2024 Confirmed source ↗
20 years plus two 5-year options; 49 acres Phase 1 plus 77 acres Phase 2; Phase 2 rent estimated at RM5.6bn over the initial term
Power supply
Dedicated substationDec 2025 Reported source ↗
On-site substation under construction; Ph1 ~100MW, Ph2 200-250MW · Applies to the whole campus.
Renewable power dealTotalEnergies / MK Land (via TNB grid) · 20 MW · Dec 2025 Confirmed source ↗
Solar, 21 years, Corporate Green Power Programme, construction from early 2026 · Covers Google's Malaysia data centres; Elmina not named · Covers the operator's wider portfolio in this country, not this site alone.
Water and cooling
WaterMains drinking water · Air Selangor Reported source ↗
CoolingWater-cooled chillers Reported source ↗
Google states water cooling for this site
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedTECO Electric & Machinery (via NCL Energy) · Mechanical and electrical works · RM170m (≈US$38m) · Jul 2025 source ↗
This project is one of 2 that fit. The other is Google Elmina 2 (SDP EBP Asset II).
UnconfirmedGamuda, IJM and Sunway Construction · Bidder · Jul 2025 source ↗
This project is one of 2 that fit. The other is Google (Pearl Computing) Port Dickson.
UnconfirmedSunway Construction Sdn Bhd · Main contractor · RM747.8m (≈US$168m) · Mar 2024 source ↗
This project is one of 4 that fit. The others are AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley), EdgeConneX Cyberjaya Campus, Vantage KUL2.

Sources checked 2026-10-21

  1. simedarbyproperty.com
  2. datacenterdynamics.com
  3. mingtiandi.com
  4. Google's Elmina data centre to operate within nine months (Media Selangor, 2026-08-20)
  5. From township builder to AI landlord: Sime Darby Property resets game plan, aims for data centre dominance (EdgeProp Malaysia, 2026-02-24)

Same campus, Elmina Business Park

More in Klang Valley

Also run by Google

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.