TM One Klang Valley Core Data Centre (KVDC)

Cyberjaya, Selangor, Malaysia · Klang Valley market · location approximate to city level

TM One Klang Valley Core Data Centre (KVDC) is a data center project in Cyberjaya, Malaysia, operated by TM One (Telekom Malaysia). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
TM One (Telekom Malaysia)
Telco
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and TM One Klang Valley Core Data Centre (KVDC) has no published figure so it sits outside that ranking. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

It is the only TM One project ArusGrid tracks. Named funding comes from Telekom Malaysia on the equity side. The named user of the compute is Malaysian government/enterprise (reported, unconfirmed).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 21 August 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusUnlikely

government/enterprise core DC

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

KVDC Block 2 · Under constructionSize not published, target 2025

Who is behind it

OperatorTM One (Telekom Malaysia) · Telco
Funder, EquityTelekom Malaysia

Who uses the compute

Tenant · governmentMalaysian government/enterprise · reported, unconfirmed

Checked on 2026-10-03. No document names a confirmed user beyond the rows above.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
ArchitectAsima Architects · 2019 · completed Reported source ↗
Original KVDC build, completed 2019.
Engineering consultantDSCO Group / Zeal Perunding · 2019 · completed Reported source ↗
M&E consultant on the original KVDC build, completed 2019.
Main contractorMec Jati Consortium · 2019 · completed Reported source ↗
Original KVDC build, completed 2019.
Main contractorGadang Construction · May 2025 Confirmed source ↗
KVDC expansion (phase 2). Topped out on 2025-05-30.

Sources checked 2026-10-20

  1. datacenterdynamics.com
  2. tm.com.my
  3. KVDC and IPDC expansion projects reach key construction milestones (PTC, 2025-12-01)
  4. TM Global expands Cyberjaya and Johor data centers (Light Reading, 2024-11-12)
  5. KVDC IPDC Expansion (TM Global, 2025-07-28)
  6. TM's data centre bet pays off as Nxera hits 70pct take-up (New Straits Times, 2026-08-21)
  7. TM ONE Klang Valley Core Data Centre (KVDC) (IEN Consultants)

More in Klang Valley

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.