Data centers in Cyberjaya

Malaysia · dataset updated 2026-10-18

ArusGrid tracks 13 active data center projects in Cyberjaya, Malaysia, with 1,073 MW of planned IT load. Of these, 4 are operational, 3 are operational and expanding, 2 are under construction, 2 are at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 636 MW. Operators have disclosed 51 MW actually running.

Cyberjaya sits in the Klang Valley market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is Vantage KUL2 at 436 MW, under construction. The operators with the most planned capacity here are Vantage Data Centers (467 MW across 2 projects), AIMS (TIME) (200 MW across 2 projects) and EdgeConneX (200 MW across 1 project).

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Vantage KUL2CyberjayaUnder construction436undisclosedVantage Data CentersLikely
AIMS Cyberjaya AI Data Centre (200MW)CyberjayaLand and permitting200undisclosedAIMS Data Centre (TIME dotCom)Confirmed
EdgeConneX Cyberjaya CampusCyberjayaUnder construction200undisclosedEdgeConneXLikely
Bridge Data Centres MY01/MY02CyberjayaExpanding10720Bridge Data Centres (Chindata)Unlikely
SQDC Cyberjaya data centreCyberjayaAnnounced65undisclosedSQDC (Selangor Industrial Corporation and DC Union joint venture)No signal either way
Vantage KUL1CyberjayaOperational3131Vantage Data CentersNo signal either way
NTT GDC Cyberjaya Campus (CBJ1-CBJ6)CyberjayaOperational22 *undisclosedNTT Global Data CentersNo signal either way
Infinaxis CDC1CyberjayaOperational12undisclosedInfinaxis (Gaw Capital / A3 Capital JV)Confirmed
AIMS Cyberjaya (Blocks 1-3)CyberjayaExpandingnone publishedundisclosedAIMS Data Centre (TIME dotCom)No signal either way
AWS Asia Pacific (Malaysia) Region (3 AZs, Klang Valley)Cyberjaya / Bukit Jalil (TPM)Expandingnone publishedundisclosedAmazon Web ServicesLikely
Digital Cosmos CyberjayaCyberjayaLand and permittingnone publishedundisclosedDigital CosmosLikely
Equinix KL2CyberjayaAnnouncednone publishedundisclosedEquinixConfirmed
TM One Klang Valley Core Data Centre (KVDC)CyberjayaOperationalnone publishedundisclosedTM One (Telekom Malaysia)Unlikely

Market pages

Other cities in Malaysia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.