AIMS Cyberjaya AI Data Centre (200MW) is a data center project in Cyberjaya, Malaysia, operated by AIMS Data Centre (TIME dotCom). It is at the land and permitting stage. It is planned for 200 MW of IT load.
Record last checked against its sources on 21 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.
Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and AIMS Cyberjaya AI Data Centre (200MW) ranks 4th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.
AIMS (TIME) has 1 other in Malaysia tracked by ArusGrid, including AIMS Cyberjaya (Blocks 1-3). It sits on the AIMS Cyberjaya campus alongside AIMS Cyberjaya (Blocks 1-3). Named funding comes from TIME dotCom and DigitalBridge on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The money on record is RM4bn (about US$1.0bn) as of February 2026, the announced investment.
Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 8 public sources for this project, the latest dated 31 August 2026, and last checked the record on 21 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
AI-computing-capable per operator (claim)
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Platform capital spans several sites. It is never added to this project's own figure.
No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Klang Valley · All projects in Malaysia · All AIMS (TIME) projects · All projects at the land and permitting stage · Data center rules in Malaysia · Full directory