Bridge Data Centres MY03

Bukit Jalil, Kuala Lumpur, Malaysia · Klang Valley market · location approximate to district level

Bridge Data Centres MY03 is a data center project in Bukit Jalil, Malaysia, operated by Bridge Data Centres (Chindata). It is operational and expanding. It is planned for 64 MW of IT load. The operator reports 16 MW running.

Latest change on record: moved to expanding on 26 June 2023. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
64 MW
Running now
16 MW
Operators rarely publish this
Operator
Bridge Data Centres (Chindata)
Colocation
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Klang Valley holds 33 active projects with 1,911 MW of planned IT load between them, and Bridge Data Centres MY03 ranks 11th by planned capacity. Of those, 5 are operational, 5 are operational and expanding, 10 are under construction, 7 are at the land and permitting stage and 6 are announced only. No third party publishes a colocation vacancy rate for Klang Valley, and ArusGrid does not estimate one.

Bridge Data Centres has 5 others in Malaysia and 2 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres MY07, Bridge Data Centres MY06 and Bridge Data Centres MY01/MY02. It sits on the MRANTI Park Bukit Jalil alongside EdgeConneX Bukit Jalil. Named funding comes from Bain Capital on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. MY03 Ph1+Ph2 at 16 MW is operational with a 2022 target; Campus expansion Ph1 at 16 MW is under construction with a 2025 target; Campus expansion Ph2 at 32 MW is announced with a 2027 target. The dated record runs from announced only on 2 February 2021 to operational and expanding on 26 June 2023.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 26 June 2023, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusNo signal either way

no cooling/density/tenant signal published

Access to AI chips

GradeLicence required for a party

A party to this project (its operator, that operator's group, a funder, or a confirmed client) is headquartered in China or Macau or has an ultimate parent there. US rules require a licence for advanced AI chips destined to such entities wherever they are located. This describes the rule and says nothing about whether a licence was sought, granted or refused. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectYes
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

MY03 Ph1+Ph2 · Operational16 MW, target 2022
Campus expansion Ph1 · Under construction16 MW, target 2025
Campus expansion Ph2 · Announced32 MW, target 2027

Stage history

2021-02-02Announced · datacenterdynamics.com
2023-06-26Expanding · telecomtalk.info

Who is behind it

OperatorBridge Data Centres (Chindata) · Colocation
Funder, EquityBain Capital

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$619m to US$837m

No figure has been announced. This range is 64 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateMRANTI (Malaysian Research Accelerator for Technology and Innovation) · Jun 2023 Reported source ↗
Campus sits in the 686-acre MRANTI Park
Power supply
Dedicated substation132kV · Jun 2023 Confirmed source ↗
132kV substation built as part of the MRANTI Park expansion · Applies to the whole campus.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM6.59m (≈US$2m) · Sep 2024 source ↗
This project is one of 3 that fit. The others are EdgeConneX Bukit Jalil, MRCB / Perintis Akal AI Data Centre (Bukit Jalil).

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. baxtel.com
  3. Bridge Data Centres expands data center at Malaysia's MRANTI Park (DCD, 2023-06-23)
  4. BRIDGE DATA CENTRES MALAYSIA II SDN BHD - DATA CENTRE @ BUKIT JALIL (MY03) (myBINA, 2022-10-17)
  5. Bridge DC Announces Expansion of MY03 Hyperscale Campus in Kuala Lumpur (TelecomTalk, 2023-06-26)
  6. Bridge Data Centres expands footprint in Malaysia with greenfield data center (DCD, 2021-02-02)

Same campus, MRANTI Park Bukit Jalil

More in Klang Valley

Also run by Bridge Data Centres

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.