Bridge Data Centres Chonburi Hyperscale Campus is a data center project in Khlong Tamru, Mueang Chonburi, Thailand, operated by Bridge Data Centres IIO (Thailand). It is under construction. It is planned for 214 MW of IT load.
Latest change on record: entered the record as under construction on 25 July 2025. Record last checked against its sources on 21 October 2026.
Next gate to watch: Tenant or own use.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Bridge Data Centres Chonburi Hyperscale Campus ranks 5th by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.
Bridge Data Centres has 1 other in Thailand and 6 projects elsewhere in the dataset tracked by ArusGrid, including Bridge Data Centres BKK01 (ex-WHA Bangkok DC). It sits on the QHI01 (Khlong Tamru, Mueang Chonburi) campus. Named funding comes from Bain Capital on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The stage was recorded as under construction on 25 July 2025. The money on record is THB 39,050m (about US$1.2bn) as of May 2026, a government approval ceiling.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 10 public sources for this project, the latest dated 8 September 2026, and last checked the record on 21 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
134MW modern greenfield hyperscale build announced 2026 by a Bain-backed hyperscale platform targeting cloud/AI demand.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.
The figure covers the whole campus.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in EEC (Eastern Seaboard) · All projects in Thailand · All Bridge Data Centres projects · All projects under construction · Data center rules in Thailand · Full directory