Directory › Thailand › EEC (Eastern Seaboard) › Haoyang Data Center 1 (WHA ESIE 4, Rayong)

Haoyang Data Center 1 (WHA ESIE 4, Rayong)

Pluak Daeng (WHA Eastern Seaboard IE 4), Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to district level

Also listed as Haoyang Data Center 1 (Thailand) Limited.

Haoyang Data Center 1 (WHA ESIE 4, Rayong) is a data center project in Pluak Daeng (WHA Eastern Seaboard IE 4), Thailand, operated by Haoyang Data Center 1 (Thailand). It is at the land and permitting stage. It is planned for 300 MW of IT load.

Latest change on record: entered the record as land and permitting on 11 June 2025. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
300 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Haoyang Data Center 1 (Thailand)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Haoyang Data Center 1 (WHA ESIE 4, Rayong) ranks third by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.

It is the only Beijing Haoyang project ArusGrid tracks. Named funding comes from Beijing Haoyang Cloud & Data Technology and Apollo Global Management on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 11 June 2025. The money on record is THB 72.67bn (about US$2.2bn) as of March 2025, a government approval ceiling.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 7 public sources for this project, the latest dated 12 June 2025, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

300MW modern greenfield (largest single approved IT load in Thailand); sponsor runs 360MW of Chinese hyperscale capacity and is Apollo-backed. No cooling/density disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2025-06-11Land and permitting · wha-industrialestate.com

Who is behind it

OperatorHaoyang Data Center 1 (Thailand) · Colocation
Funder, EquityBeijing Haoyang Cloud & Data Technology
Funder, EquityApollo Global Management

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2025-03THB 72.67bn (about US$2.2bn)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerWHA Industrial Development PCL (WHAID), WHA ESIE 4 · Jun 2025 Confirmed source ↗
Buyer Haoyang Data Center 1 (Thailand) Ltd; THB72,670m is total investment, not land price; area not disclosed
Land sellerWHA Industrial Development PCL (WHA Eastern Seaboard Industrial Estate 4) · Jun 2025 Confirmed source ↗
Land sellerWHA Industrial Development PCL (WHAID) · Jun 2025 Confirmed source ↗
Land in WHA Eastern Seaboard Industrial Estate 4, Rayong. Area and price not disclosed. THB 72.67 billion is total project investment, not land price. Buyer is Haoyang Data Center 1 (Thailand) Limited.

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. w.media
  3. wha-group.com
  4. mingtiandi.com
  5. asia.nikkei.com
  6. WHA ปิดดีลขายที่ดินให้ 'ฮ่าวหยาง' สร้างดาต้าเซ็นเตอร์ มูลค่า 72,670 ล้าน ใหญ่สุดในอาเซียน (Matichon, 2025-06-12)
  7. 72.67 Billion Baht for ASEAN's Largest Data Center, Reaffirming Thailand's Digital Leadership (WHA Industrial Development, 2025-06-11)

More in EEC (Eastern Seaboard)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.