ArusGridProject
Directory › Thailand › EEC (Eastern Seaboard) › Stratus Technology (ZData) CPGC Rayong

Stratus Technology (ZData) CPGC Rayong data center

CPGC Industrial Estate, Rayong, Rayong, Thailand · EEC (Eastern Seaboard) market · location approximate to city level

Stratus Technology (ZData) CPGC Rayong is a data center project in CPGC Industrial Estate, Rayong, Thailand, operated by Stratus Technology. It is at the land and permitting stage. It is planned for 203 MW of IT load.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
203 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Stratus Technology
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.

Thailand, 2026-09-24. Thailand asked developers on 4 September 2026 to pause 49 data centres under construction and froze 117 pending approvals while it writes new rules, due by mid October. The government has said it cannot legally enforce the pause. No list of affected projects has been published, so no Thai project has changed stage on this basis. A separate data centre electricity tariff has been created with no rate set.

Where it sits

EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Stratus Technology (ZData) CPGC Rayong ranks 6th by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.

ZDATA Technologies (China) has 1 other in Thailand and 1 project elsewhere in the dataset tracked by ArusGrid, including Vistas Technology (ZData) Amata City Chonburi. Named funding comes from CNISP Group, HongShan Capital and Eastern Bell Capital on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is THB 23.7bn (about US$727m) as of June 2025, a government approval ceiling.

Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 8 September 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

>=100MW modern greenfield announced 2025 by a Chinese hyperscale platform; Tier III design stated, no density disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorStratus Technology · Colocation
Funder, EquityCNISP Group
Funder, EquityHongShan Capital
Funder, EquityEastern Bell Capital

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2025-06THB 23.7bn (about US$727m)

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateCPGC Industrial Estate (Charoen Pokphand Group) · Jun 2025 Reported source ↗

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. mingtiandi.com
  3. datacentermap.com
  4. Thailand data centre licences top 1GW of power (ASEAN NOW, 2026-09-08)
  5. Thailand BOI Approves 28.6 Billion Baht in New Investments; Adds Incentives for the Use of Local Content in Electric Vehicle and E&E Manufacturing (Thailand Board of Investment, 2025-06-27)
  6. เปิดพิกัด 65 ดาต้าเซ็นเตอร์ กรุงเทพฯ เยอะสุด 45 แห่ง ตจว. กระจุกตัวพื้นที่ EEC (Naewna, 2026-09-04)

More in EEC (Eastern Seaboard)

Also run by ZDATA Technologies (China)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.