Stratus Technology (ZData) CPGC Rayong is a data center project in CPGC Industrial Estate, Rayong, Thailand, operated by Stratus Technology. It is at the land and permitting stage. It is planned for 203 MW of IT load.
Record last checked against its sources on 21 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Thailand approves, powers and taxes data centers is on Data center rules in Thailand.
EEC (Eastern Seaboard) holds 21 active projects with 3,703 MW of planned IT load between them, and Stratus Technology (ZData) CPGC Rayong ranks 6th by planned capacity. Of those, 2 are operational, 1 is operational and expanding, 9 are under construction, 7 are at the land and permitting stage and 2 are announced only. No third party publishes a colocation vacancy rate for EEC (Eastern Seaboard), and ArusGrid does not estimate one.
ZDATA Technologies (China) has 1 other in Thailand and 1 project elsewhere in the dataset tracked by ArusGrid, including Vistas Technology (ZData) Amata City Chonburi. Named funding comes from CNISP Group, HongShan Capital and Eastern Bell Capital on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The money on record is THB 23.7bn (about US$727m) as of June 2025, a government approval ceiling.
Grid power for a large industrial user in Thailand costs about US$0.10 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Thailand, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 8 September 2026, and last checked the record on 21 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
>=100MW modern greenfield announced 2025 by a Chinese hyperscale platform; Tier III design stated, no density disclosure.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.
The figure covers the whole campus.
No published price band exists for Thailand, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.