ZDATA Johor GP3 data center

Gelang Patah, Johor, Malaysia · Johor market · location approximate to city level

Also listed as ZDATA Technologies data centre Gelang Patah.

ZDATA Johor GP3 is a data center project in Gelang Patah, Malaysia, operated by ZDATA Technologies (China). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as under construction on 11 March 2026. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
ZDATA Technologies (China)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and ZDATA Johor GP3 has no published figure so it sits outside that ranking. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

ZDATA Technologies (China) has 2 projects elsewhere in the dataset tracked by ArusGrid, including Stratus Technology (ZData) CPGC Rayong and Vistas Technology (ZData) Amata City Chonburi. It sits on the ZDATA Gelang Patah campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as under construction on 11 March 2026. The money on record is RM240m (about US$55m) as of October 2024, the announced investment. Power comes from BGMC Energy Holdings Sdn Bhd and reNIKOLA Holdings Sdn Bhd (reported, unconfirmed). Cooling uses reclaimed water from IWK treated effluent via Johor Special Water; plant by Ocned Water Technology (Computility Technology).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 14 March 2026, and last checked the record on 18 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

GPU/computility operator

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-03-11Under construction · bernamabiz.com

Who is behind it

OperatorZDATA Technologies (China) · Colocation

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2024-10RM240m (about US$55m)

The figure covers land only.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerTropicana Corp Bhd (Tropicana Firstwide Sdn Bhd) · 38 acres · RM240m (≈US$54m) · Oct 2024 Confirmed source ↗
Buyer Computility Technology (Malaysia) Sdn Bhd (ZData Technologies); Gelang Patah; Tropicana also acts as site developer
Power supply
Power allocation or planBGMC Energy Holdings Sdn Bhd and reNIKOLA Holdings Sdn Bhd · Mar 2026 Reported source ↗
Term sheet only, for large-scale renewable supply including solar assets expected to operate from 2028, about 630,000 MWh a year. · Term sheet signed by Computility Technology. Not a signed PPA. · Applies to the whole campus.
Water and cooling
WaterRecycled wastewater · IWK treated effluent via Johor Special Water; plant by Ocned Water Technology (Computility Technology) · 4 MLD Reported source ↗
Designed for 100% reclaimed water; Ph1 plant opened Mar 2026, Ph2 end-2027, four plants planned; 57% potable saving
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedJati Tinggi Holding Sdn Bhd · Grid and substation works · RM12m (≈US$3m) · Jul 2026 source ↗
This project is one of 2 that fit. The other is Digital Hyperspace Johor.

Sources checked 2026-10-18

  1. datacentermap.com
  2. ZDATA To Launch Malaysia's First GreenRE Platinum Data Centre In Johor With RM8 Bln Investment (Bernama, 2026-03-11)
  3. China's Zdata eyes RM2.1b funding to expand Johor data centre amid AI boom (Malay Mail (Bloomberg), 2025-09-12)
  4. ZDATA lancar pusat data berskala besar pertama Malaysia di Johor (RTM Berita, 2026-03-14)

More in Johor

Also run by ZDATA Technologies (China)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.