YTL Power Sedenak Tech Park West Campus

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

YTL Power Sedenak Tech Park West Campus is a data center project in Sedenak (Kulai), Malaysia, operated by YTL Power (SIPP Power Sdn Bhd, 70% YTL Power). It has been announced and has not yet reached the land or permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as announced on 19 August 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
YTL Power (SIPP Power Sdn Bhd, 70% YTL Power)
Colocation
AI workloads
Likely
Evidence grade
Sourced
Will it get built?Long shot1 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and YTL Power Sedenak Tech Park West Campus has no published figure so it sits outside that ranking. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

YTL has 1 other in Malaysia tracked by ArusGrid, including YTL Green Data Center Park. It sits on the Sedenak Tech Park West (IBTEC). Named funding comes from YTL Power International on the equity side and JLand Group (Johor Corporation). No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 19 August 2026.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 20 August 2026, and last checked the record on 22 October 2026.

How well evidenced is it

One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

gigawatt-scale greenfield stated for AI and cloud workloads by an operator already running Nvidia GB200 NVL72 at Kulai (YTL Power, 2026-08-19)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-08-19Announced · ytlpowerinternational.com

Who is behind it

OperatorYTL Power (SIPP Power Sdn Bhd, 70% YTL Power) · Colocation
Funder, EquityYTL Power International
Funder, Joint venture partnerJLand Group (Johor Corporation)

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-22

  1. YTL Power and JLand Group Collaborate on New Gigawatt-Scale Data Centre Campus at Sedenak Tech Park (YTL Power International, 2026-08-19)
  2. YTL Power to develop new gigawatt data centre campus in Johor (The Edge Malaysia, 2026-08-19)
  3. YTL Power and JLand to partner to build up to 1.5GW data center in Johor (W.Media, 2026-08-20)
  4. STeP West deal to take YTL Power's DC capacity beyond 2GW – analysts (New Straits Times via KLSE Screener, 2026-08-20)

More in Johor

Also run by YTL

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.