Keppel DC Johor 1 (+ Sedenak expansion)

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

Also listed as Keppel data centre Kulai and Keppel DC Johor 1 Sedenak.

Keppel DC Johor 1 (+ Sedenak expansion) is a data center project in Sedenak (Kulai), Malaysia, operated by Keppel Data Centres. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one. The operator reports 10 MW running.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
10 MW
Operators rarely publish this
Operator
Keppel Data Centres
Colocation
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Keppel DC Johor 1 (+ Sedenak expansion) has no published figure so it sits outside that ranking. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Keppel has 9 projects elsewhere in the dataset tracked by ArusGrid, including Keppel DC SGP 11, Jurong Island (DC-CFA2), Keppel Floating Data Centre and DC1. It sits on the Keppel Sedenak/Kulai campus. The named user of the compute is Microsoft (reported, unconfirmed).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 18 September 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusUnlikely

2020-era 10MW built-to-suit

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

KDC Johor 1 (built-to-suit) · Operational10 MW, target 2020

Who is behind it

OperatorKeppel Data Centres · Colocation

Who uses the compute

Tenant · hyperscalerMicrosoft · rumoured

Full building, build-to-suit with purchase option · as of 2022-09-29

DCD (2018-11-27) reported Keppel Data Centres Holding and Alpha DC Fund would build a Tier III build-to-suit in Sedenak for 'one of the top three cloud operators globally', 'understood to be Microsoft'. DCD (2022-09-29) on Keppel Corp's acquisition of the asset repeats that the cloud-provider tenant was 'rumored to be Microsoft' and held a purchase option. Never confirmed by Keppel or Microsoft in the eight years since; DCD is the named source.

Source · Keppel subsidiaries to build a DC for cloud giant in Johor, Malaysia (DCD, 2018-11-27)

Source · Keppel Corp acquires data center in Malaysia owned by its subsidiaries (DCD, 2022-09-29)

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-20

  1. keppeldatacentres.com
  2. datacentermap.com
  3. baxtel.com
  4. Keppel Data Centres and the Alpha Data Centre Fund to develop and operate maiden greenfield data centre in Johor, Malaysia (Keppel, 2018-11-26)
  5. Keppel DC-REIT focuses on sustainable growth (The Star, 2026-09-18)

More in Johor

Also run by Keppel

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.