Keppel DC SGP 11, Jurong Island (DC-CFA2) is a data center project in Jurong Island, Singapore, operated by Keppel Data Centres. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.

Latest change on record: entered the record as announced on 21 August 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Keppel Data Centres
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Keppel DC SGP 11, Jurong Island (DC-CFA2) ranks 8th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Keppel has 8 others in Singapore and 1 project elsewhere in the dataset tracked by ArusGrid, including Keppel Floating Data Centre, DC1 and Keppel DC Singapore 1. It sits on the Jurong Island Data Centre Park alongside Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2) and STT GDC Jurong Island (DC-CFA2). Named funding comes from Keppel Data Centre Fund III on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as announced only on 21 August 2026. The money on record is S$1bn (about US$780m) as of August 2026, the announced investment.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 21 August 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No AI tenant, workload or design disclosure. The DC-CFA2 award is gated on sustainability criteria rather than a stated AI purpose, so no inference is drawn.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-08-21Announced · edb.gov.sg

Who is behind it

OperatorKeppel Data Centres · Colocation
Funder, EquityKeppel Data Centre Fund III

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-08S$1bn (about US$780m)

Colocation price per kW of IT load per month

ArusGrid estimate, grade CUSD 261 to USD 373

ArusGrid estimate, grade C. Published band for this country. Priced on the hyperscale band, which already reflects anchor deals. No usable capex for this site. Electricity excluded in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, hyperscale (2024-12)USD 261 to USD 373 datacenterHawk for NTT DC REIT, 2025-07-07
Land
Allocated byJTC Corporation (Jurong Island low-carbon data centre park) · Aug 2026 Reported source ↗
Provisional 50MW allocation in a park JTC is developing on Jurong Island. Plot size and lease term not disclosed.
Power supply
Power allocation or plan50 MW · Aug 2026 Reported source ↗
Committed >50% of capacity from green energy (biomethane, low-carbon ammonia/hydrogen, BIPV/BAPV) · DC-CFA2 provisional 50MW allocation; liquid cooling, Green Mark DC Platinum required
Water and cooling
Coolingdesign PUE 1.2 Confirmed source ↗
Keppel is exploring interconnected centralised cooling at district level with JTC. Specific cooling type for DC SGP 11 not stated beyond the DC-CFA2 liquid cooling condition.
Cooling Confirmed source ↗
Cooling design not specified. Keppel cites its liquid, district and seawater cooling track record.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedIndustrial raw water · Jurong Island utility providers (demineralised water, seawater cooling circuits) source ↗
This project is one of 4 that fit. The others are Digital Realty Jurong Island (DC-CFA2), Equinix Jurong Island (DC-CFA2), STT GDC Jurong Island (DC-CFA2).

Sources checked 2026-10-21

  1. Four data centre proposals selected as part of second Data Centre Call for Application (Singapore Economic Development Board, 2026-08-21)
  2. Singapore picks four operators to boost data centre capacity by 200MW (Techgoondu, 2026-08-21)
  3. Singapore gov't allocates 200MW of power for four data center developers on Jurong Island (DatacenterDynamics, 2026-08-21)
  4. Keppel awarded 50 MW new data centre capacity under Singapore’s second Data Centre Call for Application (Keppel, 2026-08-21)
  5. Singapore’s DC-CFA2 winners announced; third CFA possible (W.Media, 2026-08-21)
  6. Keppel awarded 50 MW new data centre capacity under Singapore's second Data Centre Call for Application (Keppel Ltd via SGX, 2026-08-21)

Same campus, Jurong Island Data Centre Park

More in Singapore

Also run by Keppel

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.