Digital Jurong (SIN10) is a data center project in Singapore, operated by Digital Realty. It is operational. It is planned for about 30 MW of IT load, a figure ArusGrid derived from a published total.
Record last checked against its sources on 20 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.
Singapore holds 39 active projects with 874 MW of planned IT load between them, and Digital Jurong (SIN10) ranks 13th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.
Digital Realty has 3 others in Singapore and 2 projects elsewhere in the dataset tracked by ArusGrid, including Digital Loyang II (SIN12), Digital Realty Jurong Island (DC-CFA2) and Digital Loyang I (SIN11). It sits on the Digital Realty Singapore campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
Power comes from Tuas Power (reported, unconfirmed).
Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 9 December 2010, and last checked the record on 20 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
legacy build
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
Digital Realty's Singapore metro, three buildings blended: annualised rent US$276.2m on 72 MW at 93.9 percent occupancy gives about US$340 per occupied kW, while the same supplemental prices Singapore leases under 1 MW at US$327 and over 1 MW at US$135 per kW per month Electricity excluded. As of 2026-06. Digital Realty via SEC EDGAR, 2026-08-01
One disclosure for SIN10, SIN11 and SIN12 together, so no single building carries it, and the occupancy basis mixes square feet with MW. The range shown runs from the over 1 MW figure to the under 1 MW figure. Electricity excluded, utilities reimbursed separately.
All projects in Singapore · All projects in Singapore · All Digital Realty projects · All projects operational · Data center rules in Singapore · Full directory