Nxera Kim Chuan 2 data center

Singapore, Singapore · Singapore market · location approximate to district level

Nxera Kim Chuan 2 is a data center project in Singapore, operated by Nxera (Singtel). It is operational. It is planned for 21 MW of IT load.

Latest change on record: entered the record as operational in 2010. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
21 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Nxera (Singtel)
Telco
AI workloads
Unlikely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Nxera Kim Chuan 2 ranks 16th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Nxera (Singtel) has 2 others in Singapore tracked by ArusGrid, including Nxera DC Tuas and Nxera DC West. Named funding comes from Singtel on the equity side. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational in 2010.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 11 September 2024, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsNo

AI workloads

StatusUnlikely

legacy Singtel DC

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2010Operational · datacenterdynamics.com

Who is behind it

OperatorNxera (Singtel) · Telco
Funder, EquitySingtel

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Platform deals that include it

KKR 20% stake in Nxera
Platform capital, 2023-09
US$800m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

The published band for Singapore is too wide to say anything useful about this building (range wider than half its midpoint, withheld), so no estimate is shown. The band itself is on the Colo prices page.

Water and cooling
CoolingWater-cooled chillers Confirmed source ↗
Dual-ring closed-loop water-cooled chiller system with a fully redundant 2N chilled water distribution system and N+1 CRAC units.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedObayashi Singapore Pte Ltd · Main contractor source ↗
This project is one of 3 that fit. The others are Nxera DC Tuas, Nxera DC West.

Sources checked 2026-10-22

  1. datacentermap.com
  2. Singtel to close five legacy data centers in Singapore - report (DatacenterDynamics, 2024-09-11)
  3. Singtel to close five legacy data centers in Singapore - report (DatacenterDynamics, 2024-09-11)
  4. Singtel to build a multi-million dollar state-of-the-art green data centre (Singtel, 2008-04-23)
  5. SingTel to build datacenter (DCD, 2008-04-22)
  6. Singapore - DC Kim Chuan 2 (Nxera)

More in Singapore

Also run by Nxera (Singtel)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.