Equinix SG6 data center

Singapore, Singapore · Singapore market · location approximate to district level

Equinix SG6 is a data center project in Singapore, operated by Equinix. It is under construction. It is planned for 20 MW of IT load.

Latest change on record: entered the record as under construction in November 2024. Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
20 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Equinix
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Money committed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Singapore approves, powers and taxes data centers is on Data center rules in Singapore.

Where it sits

Singapore holds 39 active projects with 874 MW of planned IT load between them, and Equinix SG6 ranks 18th by planned capacity. Of those, 27 are operational, 3 are operational and expanding, 3 are under construction, 1 is past financial close and 5 are announced only. Published colocation vacancy in Singapore was 4.9% as of December 2025, on 1,043 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Equinix has 6 others in Singapore and 5 projects elsewhere in the dataset tracked by ArusGrid, including Equinix Jurong Island (DC-CFA2), Equinix SG1 and Equinix SG2. It sits on the Equinix Singapore campus alongside Equinix SG1, Equinix SG2, Equinix SG3 and Equinix SG4. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction in November 2024. The money on record is US$260m as of November 2024, the announced investment. Power comes from Sembcorp Industries through a renewable power purchase agreement.

Grid power for a large industrial user in Singapore costs about US$0.20 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Singapore, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 19 November 2024, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

liquid cooling for AI (PR)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Full build · Under construction20 MW, target 2027

Stage history

2024-11Under construction · datacenterdynamics.com

Who is behind it

OperatorEquinix · Colocation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

Announced investment, 2024-11US$260m

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Power supply
Renewable power dealSembcorp Industries · Nov 2024 Confirmed source ↗
100% renewable coverage via Sembcorp PPA
Water and cooling
WaterRainwater harvesting Confirmed source ↗
CoolingWater-cooled chillers Confirmed source ↗
Water-cooled chillers and cooling towers, liquid cooling capable, rainwater harvesting

Sources checked 2026-10-20

  1. datacenterdynamics.com
  2. prnewswire.com
  3. Equinix breaks ground on 20MW data center in Singapore (DatacenterDynamics, 2024-11-19)
  4. Equinix Developing $260M Data Centre as Sixth Singapore Facility (Mingtiandi, 2024-11-19)

Same campus, Equinix Singapore

More in Singapore

Also run by Equinix

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.