Equinix JK1, Jakarta CBD data center

Jakarta, DKI Jakarta, Indonesia · Greater Jakarta market · location approximate to city level

Equinix JK1, Jakarta CBD is a data center project in Jakarta, Indonesia, operated by Equinix. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Equinix
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Equinix JK1, Jakarta CBD has no published figure so it sits outside that ranking. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Equinix has 11 projects elsewhere in the dataset tracked by ArusGrid, including Equinix Jurong Island (DC-CFA2), Equinix CN1 Chennai and Equinix SG6. Named funding comes from Astra International. The named user of the compute is Google Cloud (reported, unconfirmed).

The build is phased. Phase 1 (550 cabinets) at 2.4 MW is operational with a 2025 target; Full build (1,600 cabinets) is announced with a 2026 target. The money on record is US$74m as of January 2022, the announced investment. Cooling uses hybrid air and liquid cooling, with a design PUE of 1.41.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 2 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Equinix markets JK1 as its first 'AI-ready' IBX in Jakarta, with cooling arrays and liquid cooling for HPC/AI; trade press ties Google Cloud's Jakarta AI capacity expansion to the site. Liquid cooling stated by w.media on 2025-05-16. Cooling Array plus liquid cooling for high-density AI.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (550 cabinets) · Operational2.4 MW, target 2025
Full build (1,600 cabinets) · AnnouncedSize not published, target 2026

Who is behind it

OperatorEquinix · Colocation
Funder, Joint venture partnerAstra International

Who uses the compute

Tenant · hyperscalerGoogle Cloud · reported, unconfirmed

Money at this site

Announced investment, 2022-01US$74m

Platform deals that include it

Equinix / Astra International JV, JK1 Jakarta (US$74M)
Platform capital, 2022-01
US$74m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No colocation price applies to this product (retail interconnection, no colocation price applies).

Water and cooling
CoolingHybrid air and liquid cooling · design PUE 1.41 Reported source ↗
Cooling Array plus liquid cooling for high-density AI

Sources checked 2026-10-21

  1. datacenterdynamics.com
  2. w.media
  3. lightreading.com
  4. Equinix Tambah 1.100 Kabinet di Data Center JK-1 Tahun Ini, Permintaan Tinggi (Bisnis, 2026-02-03)
  5. 8 Data Center AI di Indonesia: DCI, BDx, EDGE, hingga NeutraDC (Bisnis, 2026-10-02)

More in Greater Jakarta

Also run by Equinix

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.