ArusGridProject
Directory › Indonesia › Greater Jakarta › Digital Hyperspace Indonesia JKT1A, GIIC Cikarang

Digital Hyperspace Indonesia JKT1A, GIIC Cikarang data center

Cikarang, Bekasi (GIIC Zone EE), West Java, Indonesia · Greater Jakarta market · location approximate to district level

Digital Hyperspace Indonesia JKT1A, GIIC Cikarang is a data center project in Cikarang, Bekasi (GIIC Zone EE), Indonesia, operated by PT Digital Hyperspace Indonesia (Quantum DC). It is being commissioned. It is planned for 20 MW of IT load.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Commissioning
Planned IT load
20 MW
Running now
Not disclosed
Operators rarely publish this
Operator
PT Digital Hyperspace Indonesia (Quantum DC)
Colocation
AI workloads
No signal either way
Evidence grade
Corroborated
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and Digital Hyperspace Indonesia JKT1A, GIIC Cikarang ranks 27th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Digital Hyperspace Malaysia (Quantum DC, HK) has 1 project elsewhere in the dataset tracked by ArusGrid, including Digital Hyperspace Johor. It sits on the DHI Cikarang campus. Named funding comes from Quantum DC (HK) and Global Telecom Capital (GTC) Fund on the equity side. The named user of the compute is China Telecom (reported, unconfirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 24 March 2025, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

No public signal either way.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Project Ignite (Phase 1) · Commissioning20 MW, target 2025

Who is behind it

OperatorPT Digital Hyperspace Indonesia (Quantum DC) · Colocation
Funder, EquityQuantum DC (HK)
Funder, EquityGlobal Telecom Capital (GTC) Fund

Who uses the compute

Tenant · telcoChina Telecom · reported, unconfirmed

Money at this site

ArusGrid estimate, building costabout US$191m to US$258m

No figure has been announced. This range is 20 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-20

  1. dh-indonesia.com
  2. uptimeinstitute.com
  3. datacentermap.com
  4. Digital Hyperspace JKT1A Tier III Certification of Constructed Facility (Uptime Institute, 2025-03-24)

More in Greater Jakarta

Also run by Digital Hyperspace Malaysia (Quantum DC, HK)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.