ArusGridProject
Directory › Indonesia › Greater Jakarta › AWS CGK Margamulya (KIIC Karawang)

AWS CGK Margamulya (KIIC Karawang) data center

Karawang, West Java, Indonesia · Greater Jakarta market · location approximate to district level

AWS CGK Margamulya (KIIC Karawang) is a data center project in Karawang, Indonesia, operated by Amazon Web Services. It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Amazon Web Services
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and AWS CGK Margamulya (KIIC Karawang) has no published figure so it sits outside that ranking. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

AWS has 1 other in Indonesia and 10 projects elsewhere in the dataset tracked by ArusGrid, including AWS CGK Kutanegara (Karawang). It sits on the AWS Asia Pacific (Jakarta) campus alongside AWS CGK Kutanegara (Karawang). Named funding comes from Amazon (AWS) on the equity side. The named user of the compute is AWS (own use) (confirmed).

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 7 May 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

AWS self-build serving the Asia Pacific (Jakarta) region.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorAmazon Web Services · Hyperscaler self-build
Funder, EquityAmazon (AWS)

Who uses the compute

Own use · hyperscalerAWS (own use) · confirmed

Platform deals that include it

AWS US$5B / 15-year Indonesia investment program
Country programme, 2021-12
US$5.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedPLN / Acwa Power Indonesia (PLTS Saguling floating solar) · Renewable power deal · May 2026 source ↗
This project is one of 2 that fit. The other is AWS CGK Kutanegara (Karawang).

Sources checked 2026-10-21

  1. datacentermap.com
  2. press.aboutamazon.com
  3. PLTS Terapung untuk Data Center Amazon Tersendat, Pengembang Lapor Purbaya (Bisnis, 2026-05-07)
  4. Indonesia Sustainability Fact Sheet (Amazon Web Services)

Same campus, AWS Asia Pacific (Jakarta)

More in Greater Jakarta

Also run by AWS

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.