AWS Palava is a data center project in Palava (Dombivli), India, operated by Amazon Web Services (Amazon Data Services India). It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 6 December 2024. Record last checked against its sources on 17 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Amazon Web Services (Amazon Data Services India)
Hyperscaler self-build
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and AWS Palava has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

AWS has 4 others in India and 7 projects elsewhere in the dataset tracked by ArusGrid, including AWS Thane (Balkum-Majiwada), AWS Asia Pacific (Hyderabad) region, existing sites and AWS Bharat Future City campus. It sits on the Lodha Palava Green Integrated Data Centre Park alongside Digital Edge Palava. Named funding comes from Amazon on the equity side. The named user of the compute is Amazon Web Services (reported, unconfirmed).

The stage was recorded as at the land and permitting stage on 6 December 2024. The money on record is INR 5.75bn (about US$68m) as of May 2026, the announced investment. Power comes from unspecified (reported, unconfirmed).

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 10 June 2026, and last checked the record on 17 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Hyperscaler self-build land acquired 2024 onward.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2024-12-06Land and permitting · datacenterdynamics.com

Who is behind it

OperatorAmazon Web Services (Amazon Data Services India) · Hyperscaler self-build
Funder, EquityAmazon

Who uses the compute

Own use · hyperscalerAmazon Web Services · reported, unconfirmed

Self-build on 38.18 acres bought from Macrotech (Lodha) for Rs 450 crore, about 4.16m sq ft planned · as of 2024-12-06

Amazon Data Services bought the Palava City parcel from Lodha for a data centre; ET-sourced via DCD. Land purchase, no tenant named.

Source · AWS acquires 38 acres near Mumbai, India, for potential data center build (DCD, 2024-12-06)

Money at this site

Announced investment, 2026-05INR 5.75bn (about US$68m)

The figure covers land only.

Platform deals that include it

Lodha Developers MoUs with Maharashtra, Rs 1.3 lakh crore for a 2.5GW Green Integrated Data Centre Park at Palava
Other, 2026-01-19
US$15.1bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

An own-use build. No colocation price applies.

Land
Land sellerLodha Developers (Macrotech) · 38.18 acres · INR 450m (≈US$53m) · freehold · Nov 2024 Reported source ↗
Purchase registered Nov 2024; initial payment Rs 396 crore.
Land sellerLodha Developers (Macrotech) · 10.6 acres · INR 125.13m (≈US$15m) · freehold · May 2026 Reported source ↗
FSI 2.5 for data centre and ancillary use.
Power supply
Power allocation or planunspecified · Jan 2026 Reported source ↗
Lodha says Amazon 'secured 15-year power arrangements' for its Palava parcel; counterparty and MW not stated.
Dedicated substationMaharashtra state transmission utility (STU) · 1,450 MW · 400kV · Jun 2026 Reported source ↗
MERC approved a 400/220kV GIS substation at Ambernath for Lodha's Palava data centre park, funded by Lodha. The state transmission utility has granted about 1,450MW of grid connectivity in the Ambernath region, with about 1,500MW more under consideration. This is park-level grid capacity, not this site's share and not IT load. The article names Amazon Web Services among the park's operators. · Applies to the whole campus.

Sources checked 2026-10-17

  1. AWS acquires 38 acres near Mumbai, India, for potential data center build (DCD, 2024-12-06)
  2. Amazon Data Services India buys 10.6 acres of land in MMR for ₹125 cr (Business Standard, 2026-06-01)
  3. Lodha Developers to invest Rs 1.3 lakh crore for 2.5 GW data centre park near Mumbai (Lodha Developers, 2026-01-27)
  4. Amazon Expands Data Center Footprint, Buys 10.6 Acres in MMR for INR 125 Crore (StartupTalky (citing CRE Matrix documents), 2026-06-01)
  5. Maharashtra Approves Transmission For Rs 1.3 tn Data Centre Park (Construction World, 2026-06-10)

Same campus, Lodha Palava Green Integrated Data Centre Park

More in Mumbai metro

Also run by AWS

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.