Digital Edge Palava data center

Palava (Dombivli), Maharashtra, India · Mumbai metro market · location approximate to district level

Digital Edge Palava is a data center project in Palava (Dombivli), India, operated by Digital Edge DC. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: entered the record as land and permitting on 6 July 2026. Record last checked against its sources on 12 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
Digital Edge DC
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and Digital Edge Palava has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

Digital Edge has 1 other in India and 4 projects elsewhere in the dataset tracked by ArusGrid, including Digital Edge BOM1 campus. It sits on the Lodha Palava Green Integrated Data Centre Park alongside AWS Palava. Named funding comes from Stonepeak on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 6 July 2026. The money on record is INR 10bn (about US$104m) as of July 2026, the announced investment.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 13 July 2026, and last checked the record on 12 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

270MW greenfield target.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2026-07-06Land and permitting · datacenterdynamics.com

Who is behind it

OperatorDigital Edge DC · Colocation
Funder, EquityStonepeak

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-07INR 10bn (about US$104m)

The figure covers land only.

Platform deals that include it

Lodha Developers MoUs with Maharashtra, Rs 1.3 lakh crore for a 2.5GW Green Integrated Data Centre Park at Palava
Other, 2026-01-19
US$15.1bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Land
Land sellerLodha Developers (Macrotech) · 30 acres · INR 1,000m (≈US$104m) · Jul 2026 Reported source ↗
Lodha confirmed the transaction to DCD.

Sources checked 2026-10-12

  1. Digital Edge looking to develop 270MW data center near Mumbai, India (DCD, 2026-07-06)
  2. Palava land deal points to Digital Edge's second India data center (W.Media, 2026-07-13)
  3. Digital Edge Acquires 30 Acres at Palava for 270MW Data Centre Development (CXO Digital Pulse, 2026-07-07)

Same campus, Lodha Palava Green Integrated Data Centre Park

More in Mumbai metro

Also run by Digital Edge

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.