L&T Vyoma Mahape data center

Navi Mumbai (Mahape), Maharashtra, India · Mumbai metro market · location approximate to district level

L&T Vyoma Mahape is a data center project in Navi Mumbai (Mahape), India, operated by Larsen & Toubro Vyoma. It is under construction. The published capacity figure is 40 MW, and its basis is not stated as IT load.

Latest change on record: entered the record as under construction on 21 January 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
40 MW
unstated
Running now
Not disclosed
Operators rarely publish this
Operator
Larsen & Toubro Vyoma
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes4 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and L&T Vyoma Mahape ranks 21th by planned capacity. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

L&T Vyoma has 2 others in India tracked by ArusGrid, including L&T Vyoma Dholera and L&T Vyoma CHN 1. Named funding comes from Larsen & Toubro on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 21 January 2026. Cooling uses direct liquid cooling.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 5 public sources for this project, the latest dated 13 August 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

L&T describes the facility as AI-ready for GPU workloads. No tenant named.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 · Under construction40 MW

Stage history

2026-01-21Under construction · domain-b.com

Who is behind it

OperatorLarsen & Toubro Vyoma · Colocation
Funder, EquityLarsen & Toubro

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

ArusGrid estimate, grade CINR 7,650 to INR 11,900 (about USD 91 to 142)

ArusGrid estimate, grade C. Published band for this country. Priced on the wholesale band. No usable capex for this site. Electricity unstated in the band. An estimate, never a quote, computed by fixed rules published on the Colo prices page and never counted in any total.

market band, wholesale (2024-12)INR 7,650 to INR 11,900 Cushman & Wakefield for Sify Infinit Spaces, 2025-10-16
Water and cooling
CoolingDirect liquid cooling Confirmed source ↗
Direct-to-chip liquid cooling stated at groundbreaking.

Sources checked 2026-10-22

  1. L&T Vyoma Breaks Ground on 40 MW Green, AI-Ready Data Centre in Navi Mumbai (domain-b, 2026-01-21)
  2. L&T Vyoma Starts 40 MW AI-Ready Data Centre in Navi Mumbai (Industrial Automation India, 2026-01-21)
  3. Inside L&T Vyoma's Plan To Build India's AI Infrastructure Giant (Inc42, 2026-08-13)
  4. Larsen & Toubro Vyoma breaks ground on 40 MW green, AI-ready data centre in Navi Mumbai (Larsen & Toubro, 2026-01-21)
  5. Agenda of 309th meeting of SEIAA Maharashtra (SEIAA Maharashtra (environmentclearance.nic.in), 2025-10-14)

More in Mumbai metro

Also run by L&T Vyoma

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.