ArusGrid tracks 17 active data center projects in Navi Mumbai, India, with 1,876 MW of planned IT load. Of these, 2 are operational, 5 are operational and expanding, 7 are under construction, 1 is at the land and permitting stage and 2 are announced only. Projects under construction or commissioning account for 487 MW. Operators have disclosed 315 MW actually running.
Navi Mumbai sits in the Mumbai metro market, which is the level at which brokers publish vacancy and ArusGrid compares supply. The largest project is NTT Navi Mumbai 2 (NAV2) at 336 MW, announced only. The operators with the most planned capacity here are NTT (436 MW across 2 projects), Digital Edge (300 MW across 1 project) and PDG (270 MW across 2 projects).
| Project | City | Stage | Planned MW | Running MW | Operator | AI |
|---|---|---|---|---|---|---|
| NTT Navi Mumbai 2 (NAV2) | Navi Mumbai | Announced | 336 | undisclosed | NTT Global Data Centers | Likely |
| Digital Edge BOM1 campus | Navi Mumbai | Expanding | 300 * | undisclosed | Digital Edge DC | Likely |
| CtrlS Mumbai datacenter campus (DC1 to DC7) | Navi Mumbai | Operational | 214 * | 119 | CtrlS Datacenters | No signal either way |
| PDG MU1 campus | Navi Mumbai | Expanding | 150 | 48 | Princeton Digital Group | Likely |
| Sify Rabale campus | Navi Mumbai | Expanding | 136 | 84 | Sify Infinit Spaces | Likely |
| PDG MU2 | Navi Mumbai | Under construction | 120 | undisclosed | Princeton Digital Group | Likely |
| NTT Navi Mumbai 1 (NAV1) campus | Navi Mumbai | Expanding | 100 | 30 | NTT Global Data Centers | No signal either way |
| Colt Airoli expansion campus | Navi Mumbai (Airoli) | Under construction | 100 * | undisclosed | Colt Data Centre Services | Likely |
| Iron Mountain MUM-3 | Navi Mumbai | Under construction | 85 | undisclosed | Iron Mountain Data Centers (Web Werks JV) | Likely |
| STT GDC Navi Mumbai 2 and 3 | Navi Mumbai | Under construction | 80 * | undisclosed | STT GDC India | |
| CapitaLand Data Centre Navi Mumbai | Navi Mumbai | Expanding | 71 | 34 | CapitaLand India | No signal either way |
| AirTrunk BOM1 (ex-Lumina Airoli) | Navi Mumbai | Under construction | 62 | undisclosed | AirTrunk (Lumina CloudInfra) | Likely |
| ESR MU1 Rabale | Navi Mumbai (Rabale) | Announced | 60 * | undisclosed | ESR | No signal either way |
| L&T Vyoma Mahape | Navi Mumbai (Mahape) | Under construction | 40 * | undisclosed | Larsen & Toubro Vyoma | Likely |
| Colt Mumbai 1 and 2 | Navi Mumbai | Operational | 22 | undisclosed | Colt Data Centre Services | No signal either way |
| AWS Airoli | Navi Mumbai | Land and permitting | none published | undisclosed | Amazon Web Services | Likely |
| EverYondr Mumbai 1 (Google build-to-suit) | Navi Mumbai | Under construction | none published | undisclosed | EverYondr (Everstone Group) | Likely |
NTT · Digital Edge · PDG · CtrlS · Sify · Colt DCS · Iron Mountain · AirTrunk · L&T Vyoma · Amazon
All projects in India · Full directory