EverYondr Mumbai 1 (Google build-to-suit) data center

Navi Mumbai, Maharashtra, India · Mumbai metro market · location approximate to district level

EverYondr Mumbai 1 (Google build-to-suit) is a data center project in Navi Mumbai, India, operated by EverYondr (Everstone Group). It is under construction. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to under construction on 31 March 2026. Record last checked against its sources on 13 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
EverYondr (Everstone Group)
Local developer
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How India approves, powers and taxes data centers is on Data center rules in India.

Where it sits

Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and EverYondr Mumbai 1 (Google build-to-suit) has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.

It is the only EverYondr project ArusGrid tracks. Named funding comes from Everstone Group on the equity side. The named user of the compute is Google (confirmed).

The dated record runs from at the land and permitting stage on 31 October 2022 to under construction on 31 March 2026.

The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 4 public sources for this project, the latest dated 1 June 2026, and last checked the record on 13 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Hyperscaler build-to-suit leased by a Google entity for 28 years.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Stage history

2022-10-31Land and permitting · w.media
2026-03-31Under construction · princetondg.com

Who is behind it

OperatorEverYondr (Everstone Group) · Local developer
Funder, EquityEverstone Group

Who uses the compute

Tenant · hyperscalerGoogle · confirmed

Full building, 381,000 sq ft eight-storey, 28-year registered lease · as of 2023-01-17

The CRE Matrix lease record shows Raiden Infotech India Pvt Ltd leases 3.81 lakh sq ft in the MIDC estate, Navi Mumbai, from Amanthin Info Parks Pvt Ltd (Everstone and Yondr joint venture) for 28 years at Rs 8.83 crore per month with 1.75% escalation. Amanthin is the EverYondr Mumbai 1 vehicle.

Source · Google Leases 3.81 Lakh Sq Ft Data Center Space In Navi Mumbai For 28 years (W.Media, 2023-01-17)

Source · Google signs lease agreement for eight-story data center in Navi Mumbai, India (DCD, 2023-01-20)

Colocation price per kW of IT load per month

Shell lease on record, grade AINR 232 per sq ft per month

registered lease, Google (Raiden Infotech India) 381,000 sq ft whole building, 28 years, 1.75 percent escalation Electricity excluded. As of 2022-10. W.Media on CRE Matrix data, 2023-01-17

INR 8.83 crore a month. Within 1 percent of Google's Noida lease signed a month earlier with a different landlord.

A powered shell leased to its tenant, which is a different product from colocation, so no per kW price applies.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-10-13

  1. Google Leases 3.81 Lakh Sq Ft Data Center Space In Navi Mumbai For 28 years (W.Media, 2023-01-17)
  2. Google to come up with 381,000 sq ft data centre in Navi Mumbai by 2025 (Business Standard, 2023-01-17)
  3. Yondr divests stake in India data center JV to Everstone Group (DCD, 2025-07-29)
  4. Six Monthly Compliance Report of AMANTHIN INFO PARKS PVT. LTD. (Oct 2025 to March 2026) (Amanthin Info Parks Pvt Ltd, 2026-06-01)

More in Mumbai metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.