AWS Airoli is a data center project in Navi Mumbai, India, operated by Amazon Web Services. It is at the land and permitting stage. The operator has not published a capacity figure, and ArusGrid does not estimate one.
Latest change on record: entered the record as land and permitting on 25 May 2023. Record last checked against its sources on 20 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How India approves, powers and taxes data centers is on Data center rules in India.
Mumbai metro holds 32 active projects with 2,694 MW of planned IT load between them, and AWS Airoli has no published figure so it sits outside that ranking. Of those, 4 are operational, 5 are operational and expanding, 11 are under construction, 6 are at the land and permitting stage and 6 are announced only. Published colocation vacancy in Mumbai metro was 6.6% as of June 2025. Vacancy excludes hyperscaler self-build.
Amazon has 1 other in India and 1 project elsewhere in the dataset tracked by ArusGrid, including AWS Powai. It sits on the TTC Industrial Area Bonsari campus. The named user of the compute is Amazon Web Services (confirmed).
The stage was recorded as at the land and permitting stage on 25 May 2023.
The US export control position for advanced AI chips in India, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 1 public source for this project, the latest dated 25 May 2023, and last checked the record on 20 October 2026.
One or two hard signals sit behind the announcement. The rules are fixed and published on the Methodology page.
Hyperscaler self-build with lease from Aug 2023.
This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.
No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source
registered lease, Amazon Data Services India, 451,000 sq ft G+7 building, 180 months from August 2023 Electricity excluded. As of 2023-05. DCD on Propstack data via Hindustan Times, 2023-05-25
INR 6.24 crore a month. A bare building AWS fits out itself, which is why it sits 40 percent below Google's 2022 leases.
An own-use build. No colocation price applies.