ArusGridStage
Directory › Stages › Land and permitting

Data center projects at the land and permitting stage

Southeast Asia, the Gulf and India · dataset updated 2026-10-18

Projects at the land and permitting stage have secured or are securing a site and approvals. Capital is not yet committed and construction has not been evidenced.

ArusGrid records 67 projects at the land and permitting stage, with 3,970 MW of planned IT load, led by Thailand (11 projects, 1,342 MW), Malaysia (14 projects, 1,052 MW) and Vietnam (7 projects, 392 MW). The largest is MSFusion (MegaSpeed) Bandar Cemerlang at 300 MW in Johor. The operators with the most capacity at this stage are DAMAC Digital (EDGNEX) (428 MW), ZDATA Technologies (China) (333 MW), MSFusion Sdn Bhd (MegaSpeed International) (300 MW), Beijing Haoyang (300 MW) and NTT GDC (290 MW).

Pipeline viewOpen the map

Thailand 11 projects · 1,342 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
Haoyang Data Center 1 (WHA ESIE 4, Rayong)Pluak Daeng (WHA Eastern Seaboard IE 4)Land and permitting300undisclosedHaoyang Data Center 1 (Thailand)Likely
Stratus Technology (ZData) CPGC RayongCPGC Industrial Estate, RayongLand and permitting203undisclosedStratus TechnologyLikely
Zenith Data Center and Cloud Services (Navanakorn)Navanakorn Industrial Estate, Khlong LuangLand and permitting200undisclosedZenith Data Center and Cloud ServicesLikely
Skyline Data Center (DAMAC/EDGNEX) ChachoengsaoChachoengsaoLand and permitting200undisclosedSkyline Data Center and Cloud ServicesLikely
Gorilla Technology Korat AI CampusKorat (Nakhon Ratchasima)Land and permitting150undisclosedGorilla Technology GroupLikely
Vistas Technology (ZData) Amata City ChonburiAmata City Chonburi Industrial EstateLand and permitting130undisclosedVistas TechnologyLikely
NextGen Data Center (DAMAC Digital) NavanakornNavanakorn Industrial Estate, Khlong LuangLand and permitting84undisclosedNextGen Data Center and Cloud ServicesConfirmed
K2 Data Centres BKK31-32, RayongRayong (Eastern Economic Corridor)Land and permitting50undisclosedK2 Data Centres (K2 Strategic)Likely
Stellar DC (STECON / SC Zeus) BangkokBangkokLand and permitting25undisclosedStellar DCNo signal either way
Freyr Technology (Thailand)Rayong / Samut Prakan (multi-site)Land and permittingnone publishedundisclosedFreyr Technology (Thailand)No signal either way
NTT Bangkok 5 (BKK5), ChonburiAmata City Chonburi Industrial EstateLand and permittingnone publishedundisclosedNTT Global Data CentersNo signal either way

Malaysia 14 projects · 1,052 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
MSFusion (MegaSpeed) Bandar CemerlangKota Tinggi (Bandar Cemerlang)Land and permitting300undisclosedMSFusion Sdn Bhd (MegaSpeed International)Likely
NTT Johor Bahru CampusGelang PatahLand and permitting290undisclosedNTT DATA / NTT GDCConfirmed
Global Data Infrastructure Kota Seri LangatBantingLand and permitting210undisclosedGlobal Data Infrastructure (Global Telecommunications Group)No signal either way
AIMS Cyberjaya AI Data Centre (200MW)CyberjayaLand and permitting200undisclosedAIMS Data Centre (TIME dotCom)Confirmed
Privasia SilverstreamsBagan DatukLand and permitting35 *undisclosedPrivasia TechnologyNo signal either way
FutureData Park (Ph1: Global Telecommunications DC)Kota SamarahanLand and permitting17undisclosedFutureData (TSG Group + Cyclect consortium)No signal either way
Bridge Data Centres PlentongPlentongLand and permittingnone publishedundisclosedBridge Data Centres (Malaysia IV)No signal either way
DayOne Gerbang Nusajaya (Tanjung Kupang)Iskandar Puteri (Tanjung Kupang)Land and permittingnone publishedundisclosedDayOne (ex-GDS International)No signal either way
Microsoft Nusa Cemerlang (Mukim Pulai)Iskandar Puteri (Gelang Patah)Land and permittingnone publishedundisclosedMicrosoftLikely
Bridge Data Centres BantingBanting (Kota Seri Langat)Land and permittingnone publishedundisclosedBridge Data Centres (Malaysia VII)No signal either way
DayOne Kapar Campus (land assembly)Kapar, KlangLand and permittingnone publishedundisclosedDayOne Data Centers (ex-GDS International)Likely
DayOne Southville City Campus (ex-Mah Sing DC Hub)BangiLand and permittingnone publishedundisclosedDayOne Data Centers (ex-GDS International)Likely
Digital Cosmos CyberjayaCyberjayaLand and permittingnone publishedundisclosedDigital CosmosLikely
Google (reported) Serendah CampusSerendah (Hulu Selangor)Land and permittingnone publishedundisclosedPearl Computing (Google), attribution reportedLikely

Vietnam 7 projects · 392 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
SGI-HCM Campus (AI Data Center Complex)Cu ChiLand and permitting200undisclosedAIC / KinhBac City (KBC) JVLikely
StarMason Data Centre CampusThu Duc (SHTP)Land and permitting60undisclosedStarMason JSC (Sembcorp Development / BB Holding JV)Likely
Evolution DC VN HCMC (VN02)Thu Duc (SHTP)Land and permitting52undisclosedEvolution Data CentresLikely
CMC Hyperscale DC SHTPThu Duc (SHTP)Land and permitting30undisclosedCMC AI Digital Infrastructure (CMC Corporation)Likely
Gaw Capital Project VespaThu Duc (SHTP)Land and permitting20undisclosedGaw Capital PartnersNo signal either way
G-Campus Hoa Lac (High-Tech & Data Centre Complex)Hoa LacLand and permitting20undisclosedG-Group TechnologyConfirmed
AIDC DeCenter (IPTP Networks)Da Nang (Hoa Vang)Land and permitting10undisclosedIPTP NetworksLikely

India 15 projects · 336 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
AirTrunk MAA1ChennaiLand and permitting128undisclosedAirTrunkLikely
PDG HY1HyderabadLand and permitting90undisclosedPrinceton Digital GroupLikely
Colt DCS Chennai 1 (Ambattur)ChennaiLand and permitting70undisclosedColt Data Centre Services
AirTrunk BOM3 MumbaiChandivali, MumbaiLand and permitting48undisclosedAirTrunk (formerly Lumina CloudInfra)No signal either way
Fortune AI Data Centre Park, KandukurKandukur (Thimmaipally, Ranga Reddy)Land and permittingnone publishedundisclosedFortune Hospitality & Infra LLP (SPV Sudeeksha Estates LLP)Likely
TCS HyperVault Hyderabad AI campusHyderabadLand and permittingnone publishedundisclosedHyperVault (TCS)Likely
AWS AiroliNavi MumbaiLand and permittingnone publishedundisclosedAmazon Web ServicesLikely
AWS PalavaPalava (Dombivli)Land and permittingnone publishedundisclosedAmazon Web Services (Amazon Data Services India)Likely
AWS PowaiMumbaiLand and permittingnone publishedundisclosedAmazon Web ServicesLikely
AWS Taloja (Asode-Burdul)Taloja, Navi MumbaiLand and permittingnone publishedundisclosedAmazon Web Services (Amazon Data Services India)Likely
Digital Edge PalavaPalava (Dombivli)Land and permittingnone publishedundisclosedDigital Edge DCLikely
Microsoft Pune (Hinjewadi)PuneLand and permittingnone publishedundisclosedMicrosoftLikely
Reliance Vizianagaram AI Data CentreBhogapuramLand and permittingnone publishedundisclosedReliance IndustriesLikely
Sify Paradesipalem campusParadesipalem, VisakhapatnamLand and permittingnone publishedundisclosedSify Infinit SpacesNo signal either way
TCS HyperVault AnakapalliAnakapalli districtLand and permittingnone publishedundisclosedHyperVault (TCS)Likely

Saudi Arabia 4 projects · 264 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
Khazna Dammam campusDammamLand and permitting200undisclosedKhazna Data CentersLikely
DataVolt Riyadh East (First Technology Park)RiyadhLand and permitting44undisclosedDataVoltLikely
SDAIA Salboukh data centreSalboukhLand and permitting20undisclosedSDAIA (Saudi Data and AI Authority)No signal either way
Humain Al-Saad campusRiyadhLand and permittingnone publishedundisclosedHumainLikely

China 9 projects · 245 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
China Telecom Smart Cloud Base, Zhangbei Park (中国电信智慧云基地张北园区)Zhangbei County, ZhangjiakouLand and permitting150undisclosedChina Telecom (中国电信)No signal either way
Yungang Intelligent Horinger AI Computing Industrial Park (云港智能和林格尔智算产业园项目)Horinger New Area, HohhotLand and permitting88undisclosedYungang Intelligent Technology (Hohhot) Co. (云港智能科技(内蒙古自治区呼和浩特市)有限公司)Likely
Volcano Engine Zhongwei Xuanhe Computing Centre, Phase 1ZhongweiLand and permitting7.47undisclosedVolcano Engine (火山引擎), permit holder 中卫朔方星河科技有限公司Likely
CICC Data Horinger Zero-Carbon Computing Base (中金数据和林格尔零碳算力基地项目)Horinger New Area, HohhotLand and permitting81,730 racks *undisclosedShengshu Technology (Hohhot) Co. (盛数科技(呼和浩特)有限公司), CICC Data projectNo signal either way
China Unicom Wujiang Computing Centre (中国联通吴江算力中心)SuzhouLand and permitting10,000 racks *undisclosedChina Unicom Suzhou (中国联通苏州分公司)Likely
Jinkai New Energy Ulanqab 496.8MW Green Intelligent Computing Centre (金开新能乌兰察布496.8MW绿色智算中心项目)UlanqabLand and permittingnone publishedundisclosedJinkai New Energy (金开新能, SSE 600821)Likely
Kuaishou Xinghe Data Center, UlanqabJiningLand and permittingnone publishedundisclosedKuaishou (快手)Likely
China Ruifeng Xuanhua AI Computing Centre (瑞风新能源宣化智算中心)Xuanhua District, ZhangjiakouLand and permitting3,000 racks *undisclosedChina Ruifeng Renewable Energy (中国瑞风新能源, HKEX 00527)Likely
China Gold Data Zhongwei Green AI Computing Base (Xuanhe)ZhongweiLand and permittingnone publishedundisclosedChina Gold Data (中金数据(中卫)科技有限公司)Likely

Indonesia 5 projects · 239 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
DAMAC Digital Cikarang AI Campus (JKT02)Cikarang, BekasiLand and permitting144undisclosedDAMAC Digital (EDGNEX)Likely
Racks Central Batam (RCBI)BatamLand and permitting95undisclosedRacks CentralLikely
DCI Bintan Campus (Hyperscale 3 / H3)BintanLand and permittingnone publishedundisclosedDCI IndonesiaLikely
Indosat / Nvidia AI Factory, Solo TechnoparkSurakarta (Solo)Land and permittingnone publishedundisclosedIndosat Ooredoo HutchisonLikely
Pusat Data Nasional 3 (IKN / East Kalimantan)Nusantara (IKN)Land and permittingnone publishedundisclosedKementerian Komunikasi dan Digital (Komdigi)No signal either way

Philippines 1 project · 100 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
Evolution PH01 Manila (Gateway Business Park, General Trias)General TriasLand and permitting100undisclosedEvolution Data CentresLikely

Kuwait 1 project · 0 MW

ProjectCityStagePlanned MWRunning MWOperatorAI
Google Cloud Kuwait region (three sites)Sulaibiya, South Saad Al-Abdullah and Al-MutlaaLand and permittingnone publishedundisclosedGoogle CloudNo signal either way

Other stages

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.