DataVolt Riyadh East (First Technology Park)

Riyadh, Saudi Arabia · Riyadh market · location approximate to district level

DataVolt Riyadh East (First Technology Park) is a data center project in Riyadh, Saudi Arabia, operated by DataVolt. It is at the land and permitting stage. It is planned for 44 MW of IT load.

Latest change on record: entered the record as land and permitting on 29 June 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
44 MW
Running now
Not disclosed
Operators rarely publish this
Operator
DataVolt
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and DataVolt Riyadh East (First Technology Park) ranks 9th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

DataVolt has 1 other in Saudi Arabia tracked by ArusGrid, including DataVolt Oxagon AI campus. Named funding comes from Vision Invest on the equity side. The named user of the compute is Humain (confirmed).

The stage was recorded as at the land and permitting stage on 29 June 2026.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 5 public sources for this project, the latest dated 18 August 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Anchor tenant is a state AI company taking 36 of 44MW for AI workloads.

Access to AI chips

GradeGovernment-confirmed

A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationYes
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Humain · Commerce Department authorisation of 2025-11-19 for up to 35,000 Nvidia GB300 accelerators, case by case, subject to security and reporting conditions with ongoing BIS monitoring. (2025-11-20) source

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2026-06-29Land and permitting · agbi.com

Who is behind it

OperatorDataVolt · Colocation
Funder, EquityVision Invest

Who uses the compute

Tenant · enterpriseHumain · confirmed

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Allocated bySaudi Authority for Industrial Cities and Technology Zones (MODON), First Technology Park · 55,000 sqm · leased · Feb 2025 Reported source ↗
30-year lease signed with MODON (MEED, 2025-02-18).

Sources checked 2026-10-22

  1. DataVolt to secure finance for Saudi AI sites 'within 6 months' (AGBI, 2026-08-03)
  2. DataVolt lines up financing for $500 million Riyadh data centre (The Tech Capital, 2026-07-03)
  3. DataVolt seeks firms for Riyadh 72MW data centre (MEED, 2025-07-11)
  4. DataVolt to start $667m Riyadh data centre construction (MEED, 2025-02-18)
  5. "داتا فولت": السعودية تراهن على تصدير الحوسبة والذكاء الاصطناعي للعالم (Al Eqtisadiah, 2026-08-18)

More in Riyadh

Also run by DataVolt

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.