Humain / xAI Riyadh campus

Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

Humain / xAI Riyadh campus is a data center project in Riyadh, Saudi Arabia, operated by Humain. It has been announced and has not yet reached the land or permitting stage. It is planned for 50 MW of IT load.

Latest change on record: entered the record as announced on 19 November 2025. Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Announced
Planned IT load
50 MW
Running now
Not disclosed
Operators rarely publish this
Operator
Humain
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
○ Land secured○ Power arranged○ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Land secured.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and Humain / xAI Riyadh campus ranks 6th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

Humain has 4 others in Saudi Arabia tracked by ArusGrid, including Humain Dammam campus, Humain Riyadh campus and Humain and center3 Riyadh AI data centre. Named funding comes from Public Investment Fund on the equity side. The named user of the compute is xAI (reported, unconfirmed).

The stage was recorded as announced only on 19 November 2025.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 4 public sources for this project, the latest dated 30 September 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Announced with an AI lab as the counterparty and a named initial capacity buyer. Stated AI purpose.

Access to AI chips

GradeGovernment-confirmed

A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationYes
US approved operator or confirmed client on the projectYes
Named chip-vendor partnershipNo

Humain · Commerce Department authorisation of 2025-11-19 for up to 35,000 Nvidia GB300 accelerators, case by case, subject to security and reporting conditions with ongoing BIS monitoring. (2025-11-20) source

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Phases

Initial build · Announced50 MW

Stage history

2025-11-19Announced · datacenterdynamics.com

Who is behind it

OperatorHumain · Colocation
Funder, EquityPublic Investment Fund

Who uses the compute

Runs compute here · AI labxAI · reported, unconfirmed

500 MW · 500MW announced, initially 50MW per LEAP 2026 coverage; no site, builder, contract or date published as of Oct 2026 · as of 2025-11-20

DCD on the US-Saudi Investment Forum in Washington says xAI and Humain to build a 500MW data center, location 'has not been revealed', Musk says Grok will be deployed across the whole country. ArusGrid's record carries 50MW; the announced figure is 500MW and no source places it in Riyadh.

Source · xAI and Humain to build 500MW Saudi Arabia data center (DCD, 2025-11-20)

Source · Humain and Infra set up $1.2bn financing package to fund 250MW of data center space in Saudi Arabia (DCD, 2026-01-22)

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedAl Moammar Information Systems Co. (MIS) · Design and build contractor · SAR 1.88bn (≈US$501m) · Feb 2026 source ↗
This project is one of 3 that fit. The others are Humain Riyadh campus, Humain Al-Saad campus.

Sources checked 2026-10-20

  1. Humain and xAI to develop 500MW data center in Saudi Arabia (DatacenterDynamics, 2025-11-19)
  2. Saudi fires up Gulf AI race with $15bn tech deals at LEAP (Fortune, 2026-09-02)
  3. Humain secures 211 plots of land in Saudi Arabia for data centers (DatacenterDynamics, 2026-03-12)
  4. Humain plans a 1.7 GW Saudi datacenter build next year (Enterprise AM, 2026-09-30)

More in Riyadh

Also run by Humain

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.