Humain Dammam campus is a data center project in Dammam, Saudi Arabia, operated by Humain. It is under construction. It is planned for 100 MW of IT load.
Latest change on record: entered the record as under construction on 26 August 2025. Record last checked against its sources on 22 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.
Dammam / Eastern Province holds 8 active projects with 370 MW of planned IT load between them, and Humain Dammam campus ranks second by planned capacity. Of those, 4 are operational, 2 are under construction, 1 is being commissioned and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Dammam / Eastern Province, and ArusGrid does not estimate one.
Humain has 4 others in Saudi Arabia tracked by ArusGrid, including Humain Riyadh campus, Humain / xAI Riyadh campus and Humain and center3 Riyadh AI data centre. Named funding comes from Public Investment Fund on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.
The stage was recorded as under construction on 26 August 2025.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 4 public sources for this project, the latest dated 31 August 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Purpose-built by a state AI company under an Nvidia accelerator partnership. Stated AI purpose.
A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.
Humain · Commerce Department authorisation of 2025-11-19 for up to 35,000 Nvidia GB300 accelerators, case by case, subject to security and reporting conditions with ongoing BIS monitoring. (2025-11-20) source
Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source
No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.
No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.