center3 Dammam data center

Dammam, Eastern Province, Saudi Arabia · Dammam / Eastern Province market · location approximate to district level

center3 Dammam is a data center project in Dammam, Saudi Arabia, operated by center3. It is operational. The only published capacity figure is 20 MW of total facility power. IT load will be lower.

Latest change on record: entered the record as operational on 4 January 2024. Record last checked against its sources on 26 September 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
20 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
center3
Telco
AI workloads
No signal either way
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Dammam / Eastern Province holds 8 active projects with 370 MW of planned IT load between them, and center3 Dammam ranks 4th by planned capacity. Of those, 4 are operational, 2 are under construction, 1 is being commissioned and 1 is at the land and permitting stage. No third party publishes a colocation vacancy rate for Dammam / Eastern Province, and ArusGrid does not estimate one.

stc has 1 other in Saudi Arabia tracked by ArusGrid, including center3 Riyadh (Khurais). Named funding comes from stc Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as operational on 4 January 2024.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 3 public sources for this project, the latest dated 10 August 2026, and last checked the record on 26 September 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusNo signal either way

Carrier-neutral colocation with no AI tenant, workload or cooling disclosure.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2024-01-04Operational · capacityglobal.com

Who is behind it

Operatorcenter3 · Telco
Funder, Equitystc Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Build, land, power and water
Nothing found in public sources yet. Most contractors and utilities never name their data centre clients. Know who built it or where its power comes from? Tell us.

Sources checked 2026-09-26

  1. center3: The Digital Hub Powering the MENA Region (Capacity, 2024-01-04)
  2. solutions wins SAR 364M Center3 contract to build Dammam data center (Argaam, 2026-08-04)
  3. Saudi Telecom unit in deal to build data centres across Dammam (Zawya, 2026-08-10)

More in Dammam / Eastern Province

Also run by stc

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.