Data center projects in Dammam / Eastern Province

Saudi Arabia · The Gulf · dataset updated 2026-10-18

ArusGrid tracks 8 active data center projects in Dammam / Eastern Province, Saudi Arabia, with 370 MW of planned IT load. Of these, 4 are operational, 2 are under construction, 1 is being commissioned and 1 is at the land and permitting stage. Projects under construction or commissioning account for 150 MW and operational sites for 20 MW of planned capacity.

The largest project is Khazna Dammam campus at 200 MW, at the land and permitting stage. The operators with the most planned capacity here are Khazna (200 MW across 1 project), Humain (100 MW across 1 project) and Quantum Switch Tamasuk (50 MW across 1 project). No third party publishes a colocation vacancy rate for Dammam / Eastern Province, and ArusGrid does not estimate one.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”.

Open the mapPipeline view

All projects largest planned capacity first

ProjectCityStagePlanned MWRunning MWOperatorAI
Khazna Dammam campusDammamLand and permitting200undisclosedKhazna Data CentersLikely
Humain Dammam campusDammamUnder construction100undisclosedHumainLikely
Quantum Switch Tamasuk SPARK data centreKing Salman Energy Park (SPARK), near AbqaiqUnder construction50 *undisclosedQuantum Switch Tamasuk (QST)No signal either way
center3 DammamDammamOperational20 *undisclosedcenter3No signal either way
Aramco Digital Dammam (GroqCloud region)DammamOperationalnone publishedundisclosedAramco DigitalConfirmed
DAMAC Digital DMM-1 (Dammam)DammamOperationalnone publishedundisclosedDAMAC Digital (EDGNEX)No signal either way
Google Cloud Dammam regionDammamOperationalnone publishedundisclosedGoogle Cloud (with Saudi Aramco)No signal either way
Microsoft Azure Saudi Arabia region (Eastern Province)Eastern Province (sites undisclosed)Commissioningnone publishedundisclosedMicrosoftNo signal either way

Cities in this market

Other markets in Saudi Arabia

Operators here with their own page

* marks a capacity figure whose source states a basis other than IT load. Planned MW is IT load unless marked. Running capacity is rarely published, so a missing figure means undisclosed. Cancelled projects are listed and excluded from every total. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. This page is generated from the dataset, so it cannot drift from the map.