SDAIA Hexagon data center

Riyadh, Saudi Arabia · Riyadh market · location approximate to city level

SDAIA Hexagon is a data center project in Riyadh, Saudi Arabia, operated by SDAIA (Saudi Data and AI Authority). It is under construction. The only published capacity figure is 480 MW of total facility power. IT load will be lower.

Latest change on record: entered the record as under construction on 1 January 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
480 MW
Total facility power
Running now
Not disclosed
Operators rarely publish this
Operator
SDAIA (Saudi Data and AI Authority)
Local developer
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.

Where it sits

Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and SDAIA Hexagon ranks first by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.

SDAIA has 1 other in Saudi Arabia tracked by ArusGrid, including SDAIA Salboukh data centre. Named funding comes from Government of Saudi Arabia on the equity side. The named user of the compute is Government of Saudi Arabia (confirmed).

The stage was recorded as under construction on 1 January 2026. Cooling uses hybrid air and liquid cooling.

The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 6 public sources for this project, the latest dated 1 May 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (confirmed)Yes
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

Hosts more than 290 government systems. Government workloads with no disclosed AI purpose, cooling spec or accelerator deployment. Liquid cooling stated by Gulf Business on 2026-01-04. Direct liquid cooling plus hybrid systems.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source

Stage history

2026-01-01Under construction · spa.gov.sa

Who is behind it

OperatorSDAIA (Saudi Data and AI Authority) · Local developer
Funder, EquityGovernment of Saudi Arabia

Who uses the compute

Tenant · governmentGovernment of Saudi Arabia · confirmed

Colocation price per kW of IT load per month

No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorAlBawani · SAR 10.1bn (≈US$2.7bn) · Jan 2026 Confirmed source ↗
Main contractor
Water and cooling
CoolingHybrid air and liquid cooling Reported source ↗
Direct liquid cooling plus hybrid systems

Sources checked 2026-10-21

  1. Foundation Stone Laid for World's Largest Government Data Center in Riyadh (Saudi Press Agency, 2026-01-01)
  2. SDAIA lays foundation stone for 480MW Hexagon government data center in Riyadh (W.Media, 2026-01-05)
  3. Saudi Arabia launches 480MW capacity Hexagon Data Center in Riyadh (Gulf Business, 2026-01-04)
  4. Data centers dominate project awards in January (Enterprise AM, 2026-02-23)
  5. SDAIA - Hexagon Data Centre (OGN News, 2026-05-01)
  6. معلومات عن سدايا "هيكساجون" السعودي.. أكبر مركز بيانات حكومي في العالم (Al Arabiya, 2026-01-02)

More in Riyadh

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.