DAMAC Digital RUH-1 (Riyadh Industrial City 2) is a data center project in Riyadh, Saudi Arabia, operated by DAMAC Digital (EDGNEX). It is operational. It is planned for 20 MW of IT load.
Latest change on record: moved to operational on 4 June 2026. Record last checked against its sources on 21 October 2026.
This project is built or running, so every gate counts as passed.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.
Riyadh holds 14 active projects with 1,216 MW of planned IT load between them, and DAMAC Digital RUH-1 (Riyadh Industrial City 2) ranks 11th by planned capacity. Of those, 1 is operational, 1 is operational and expanding, 5 are under construction, 3 are at the land and permitting stage and 4 are announced only. No third party publishes a colocation vacancy rate for Riyadh, and ArusGrid does not estimate one.
DAMAC Digital (EDGNEX) has 1 other in Saudi Arabia and 5 projects elsewhere in the dataset tracked by ArusGrid, including DAMAC Digital DMM-1 (Dammam). Named funding comes from DAMAC Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.
The dated record runs from under construction on 29 March 2022 to operational on 4 June 2026.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 6 public sources for this project, the latest dated 4 June 2026, and last checked the record on 21 October 2026.
Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.
The operator markets AI-optimised infrastructure at company level but discloses no tenant, workload or cooling specification for this site.
Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.
Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source
Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.
No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in Riyadh · All projects in Saudi Arabia · All DAMAC Digital (EDGNEX) projects · All projects operational · Data center rules in Saudi Arabia · Full directory