DataVolt Oxagon AI campus is a data center project in Oxagon, Saudi Arabia, operated by DataVolt. It is under construction. It is planned for 360 MW of IT load.
Latest change on record: moved to under construction on 31 August 2026. Record last checked against its sources on 22 October 2026.
Next gate to watch: Power arranged.
Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.
How Saudi Arabia approves, powers and taxes data centers is on Data center rules in Saudi Arabia.
DataVolt Oxagon AI campus is the only active project ArusGrid tracks in NEOM / Oxagon, at 360 MW of planned IT load. No third party publishes a colocation vacancy rate for NEOM / Oxagon, and ArusGrid does not estimate one.
DataVolt has 1 other in Saudi Arabia tracked by ArusGrid, including DataVolt Riyadh East (First Technology Park). Named funding comes from Vision Invest on the equity side and NEOM and Humain. The named user of the compute is Humain (reported, unconfirmed).
The build is phased. Phase 1 (DataVolt 360MW first phase of 1.5GW masterplan) at 360 MW is under construction with a 2028 target; Humain co-developed tranche within phase 1 at 100 MW is under construction with a 2028 target. The dated record runs from announced only on 10 February 2025 to under construction on 31 August 2026. Cooling uses hybrid air and liquid cooling.
The US export control position for advanced AI chips in Saudi Arabia, as of 19 November 2025, is recorded as “Case-by-case authorisation only”. ArusGrid holds 8 public sources for this project, the latest dated 7 September 2026, and last checked the record on 22 October 2026.
Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.
Reaching this stage requires a dated construction source, which corroborates the project on its own.
Announced as a net-zero AI factory. Stated AI purpose with no site-level cooling or accelerator disclosure. Liquid cooling stated by w.media on 2026-07-17. Seawater provides 100% of heat rejection; 70% liquid / 30% air cooling (DataVolt NEOM).
A dated US government document names this project's operator, its parent, or a named funder as authorised to receive advanced computing items. Criteria are published on the Methodology page.
Humain · Commerce Department authorisation of 2025-11-19 for up to 35,000 Nvidia GB300 accelerators, case by case, subject to security and reporting conditions with ongoing BIS monitoring. (2025-11-20) source
Case-by-case authorisation only · Case-by-case authorisation only (2025-11-19) source
100 MW · First 100MW of the 360MW first phase, Humain-DataVolt collaboration, ground broken Sep 2026 · as of 2026-09-07
DCD reports that Humain and DataVolt broke ground on the first 100MW of the 360MW first phase of the Oxagon campus, with DataVolt as developer and operator and Humain's partnership expanded to 100MW; the campus targets 1.5GW on NEOM renewables. ArusGrid carries Humain only as a funder on this row; this is the compute commitment.
Source · Humain breaks ground on Neom's Oxagon data center (DCD, 2026-09-07)
Source · Saudi Arabia's Humain and DataVolt collaborate on data center development (DCD, 2025-11-07)
No published price band exists for Saudi Arabia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.
All projects in NEOM / Oxagon · All projects in Saudi Arabia · All DataVolt projects · All projects under construction · Data center rules in Saudi Arabia · Full directory