StarMason Data Centre Campus

Thu Duc (SHTP), Ho Chi Minh City, Vietnam · HCMC metro market · location approximate to district level

StarMason Data Centre Campus is a data center project in Thu Duc (SHTP), Vietnam, operated by StarMason JSC (Sembcorp Development / BB Holding JV). It is at the land and permitting stage. It is planned for 60 MW of IT load.

Latest change on record: entered the record as land and permitting on 8 September 2026. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
60 MW
Running now
Not disclosed
Operators rarely publish this
Operator
StarMason JSC (Sembcorp Development / BB Holding JV)
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured○ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and StarMason Data Centre Campus ranks 5th by planned capacity. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only StarMason project ArusGrid tracks. It sits on the Saigon Hi-Tech Park alongside CMC Hyperscale DC SHTP, Evolution DC VN HCMC (VN02), FPT Fornix HCM02 and Gaw Capital Project Vespa. Named funding comes from Sembcorp Development and BB Holding. No user of the capacity is on the public record as of 2026-10-03, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The stage was recorded as at the land and permitting stage on 8 September 2026. The money on record is US$480.26m as of April 2026, a government approval ceiling.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 12 public sources for this project, the latest dated 16 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Sembcorp's own press release calls it a 'hyperscale- and AI-ready data centre campus' serving cloud, AI computing and advanced workloads; Uptime Tier III targeting Tier IV. No cooling spec or tenant, so 'likely'.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Stage history

2026-09-08Land and permitting · cafef.vn

Who is behind it

OperatorStarMason JSC (Sembcorp Development / BB Holding JV) · Joint venture
Funder, Joint venture partnerSembcorp Development
Funder, Joint venture partnerBB Holding

Who uses the compute

Checked on 2026-10-03. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2026-04US$480.26m

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateSaigon Hi-Tech Park · 4.5 ha · Mar 2026 Reported source ↗
Investment approval; lease terms not disclosed
Allocated byHo Chi Minh City People's Committee (Saigon Hi-Tech Park) · 4.46 ha · leased · Sep 2026 Reported source ↗
Lot T9 in the Hi-Tech Park. Land use term runs to 24 Mar 2076.

Sources checked 2026-10-22

  1. sembcorp.com
  2. en.sggp.org.vn
  3. datacenterdynamics.com
  4. theinvestor.vn
  5. tuoitre.vn
  6. Manh nha 'song' dau tu trung tam du lieu o Viet Nam (VnExpress, 2026-08-07)
  7. Starmason secures land lease for data centre at Saigon Hi-Tech Park (VIR, 2026-09-11)
  8. HCMC leases 4.5 ha for Sembcorp-backed Starmason hyperscale data center (The Investor, 2026-09-13)
  9. Liên doanh Việt Nam - Singapore vốn 50 tỷ thuê gần 4,5 ha làm siêu trung tâm dữ liệu hơn 12.500 tỷ (CafeF, 2026-09-11)
  10. TP.HCM cho Starmason thuê gần 4,5 ha đất để đầu tư trung tâm dữ liệu siêu lớn (Báo Đầu tư, 2026-09-09)
  11. Tiết lộ 'ông lớn' đứng sau dự án trung tâm dữ liệu 480 triệu USD tại TP.HCM (Người Quan Sát, 2026-09-16)
  12. SEMBCORP DEVELOPMENT SECURES INVESTMENT APPROVAL TO DEVELOP PROPOSED HYPERSCALE- AND AI-READY DATA CENTRE CAMPUS IN HO CHI MINH CITY (Sembcorp Industries, 2026-03-27)

Same campus, Saigon Hi-Tech Park

More in HCMC metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.