FPT Fornix HCM02 data center

Thu Duc (SHTP), Ho Chi Minh City, Vietnam · HCMC metro market · location approximate to district level

FPT Fornix HCM02 is a data center project in Thu Duc (SHTP), Vietnam, operated by FPT Telecom (FPT Corporation). It is operational. The operator has not published a capacity figure, and ArusGrid does not estimate one.

Latest change on record: moved to operational on 20 August 2025. Record last checked against its sources on 18 October 2026.

Open on the mapSuggest a correction
Stage
Operational
Planned IT load
Not published
Running now
Not disclosed
Operators rarely publish this
Operator
FPT Telecom (FPT Corporation)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and FPT Fornix HCM02 has no published figure so it sits outside that ranking. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only FPT project ArusGrid tracks. It sits on the Saigon Hi-Tech Park alongside CMC Hyperscale DC SHTP, Evolution DC VN HCMC (VN02), Gaw Capital Project Vespa and StarMason Data Centre Campus. Named funding comes from FPT Corporation on the equity side. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The dated record runs from under construction on 4 May 2020 to operational on 20 August 2025.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 7 public sources for this project, the latest dated 23 September 2026, and last checked the record on 18 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

FPT runs the FPT AI Factory - thousands of Nvidia H100/H200 GPUs in Vietnam (live since Jan 2025), with HGX B300 announced for 2026 - and markets HCM02 as critical infrastructure for AI/cloud. FPT has not published which of its four Fornix sites the GPUs sit in, so I cannot upgrade THIS building to 'confirmed'.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Stage history

2020-05-04Under construction · fpt.vn
2025-08-20Operational · tuoitre.vn

Who is behind it

OperatorFPT Telecom (FPT Corporation) · Telco
Funder, EquityFPT Corporation

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Main contractorDelta Group (Delta Construction) · May 2020 · completed Confirmed source ↗
Construction of the 8-storey SHTP data centre

Sources checked 2026-10-18

  1. fpt.com
  2. datacenterdynamics.com
  3. theinvestor.vn
  4. crnasia.com
  5. FPT Cloud mở rộng vùng hạ tầng cloud tại TP.HCM sẵn sàng cho mùa cao điểm (Ministry of Science and Technology (Vietnam), 2026-09-23)
  6. FPT TELECOM LAUNCHES THE CONSTRUCTION OF VIETNAM'S BIGGEST DATA CENTER (FPT Telecom, 2020-05-04)
  7. FPT khánh thành trung tâm dữ liệu quy mô lớn (Tuoi Tre, 2025-08-20)

Same campus, Saigon Hi-Tech Park

More in HCMC metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.