Viettel Tan Phu Trung Data Center & High-Tech R&D Complex

Cu Chi, Ho Chi Minh City, Vietnam · HCMC metro market · location approximate to district level

Viettel Tan Phu Trung Data Center & High-Tech R&D Complex is a data center project in Cu Chi, Vietnam, operated by Viettel IDC (Viettel Group). It is under construction. It is planned for about 100 MW of IT load, a figure ArusGrid derived from a published total.

Latest change on record: entered the record as under construction on 23 April 2025. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
100 MW
Derived by ArusGrid
Running now
Not disclosed
Operators rarely publish this
Operator
Viettel IDC (Viettel Group)
Telco
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use✓ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and Viettel Tan Phu Trung Data Center & High-Tech R&D Complex ranks 4th by planned capacity. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Viettel has 2 others in Vietnam tracked by ArusGrid, including Viettel An Khanh Data Center and Viettel IDC Hoa Lac. It sits on the Tan Phu Trung IP (Cu Chi) campus alongside SGI-HCM Campus (AI Data Center Complex). Named funding comes from Viettel Group on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 is under construction with a 2026 target; Full build at 140 MW is announced with a 2030 target. The stage was recorded as under construction on 23 April 2025. The money on record is VND 14,700bn (about US$579m) as of October 2024, the announced investment. Power comes from EVNHCMC through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 8 public sources for this project, the latest dated 24 April 2025, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Marketed by Viettel as Vietnam's first hyperscale (>100MW) DC, designed for AI workloads and high-performance chips; PUE <1.4 target. Viettel has a standing Nvidia relationship (the Dec 2024 Vietnam-Nvidia agreement explicitly covers expansion of a Viettel AI data centre). No dated source for liquid cooling or actual GPU deployment at THIS site, so 'likely' not 'confirmed'.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 · Under constructionSize not published, target 2026
Full build · Announced140 MW, target 2030

Stage history

2025-04-23Under construction · viettimes.vn

Who is behind it

OperatorViettel IDC (Viettel Group) · Telco
Funder, EquityViettel Group

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2024-10VND 14,700bn (about US$579m)

Platform deals that include it

Nvidia-Vietnam government agreement (AI R&D centre + AI data centre)
Country programme, 2024-12
Not disclosed
Viettel 5x AI Factory data centre programme 2026-2030
Country programme, 2026-04
Not disclosed

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Project team
Construction supervisorCONINCO · Apr 2025 Confirmed source ↗
Construction supervision
Piling and earthworksVietnam Construction and Import-Export JSC (Vinaconex) · Apr 2025 Confirmed source ↗
Piling foundation and underground works package
Land
Industrial estateTân Phú Trung Industrial Park (operator not named) · 4 ha · Apr 2025 Reported source ↗
'nearly 4 hectares' in Tân Phú Trung IP, Củ Chi; allocation/lease terms not stated
Power supply
Grid supplyEVNHCMC · Sep 2026 Reported source ↗
Tariff dispute over commercial versus production rate; the utility has warned it may cut or reduce supply to data centres that do not pay
Water and cooling
CoolingWater-cooled chillers · design PUE 1.4 Reported source ↗
Chilled water with magnetic-bearing chillers, rear-door heat exchangers, immersion-ready
Coolingdesign PUE <1.4 Reported source ↗
Target PUE below 1.4 at design. Site of nearly 4 hectares for about 10,000 racks, Uptime Tier III design.

Sources checked 2026-10-22

  1. datacenterdynamics.com
  2. tuoitre.vn
  3. theinvestor.vn
  4. baodautu.vn
  5. znews.vn
  6. Bước ngoặt hạ tầng số Việt Nam: Viettel khởi công dự án tầm cỡ tại Củ Chi, TP. Hồ Chí Minh (Doanh nghiệp Hội nhập, 2025-04-24)
  7. Viettel khởi công trung tâm dữ liệu lớn bậc nhất Đông Nam Á (VietTimes, 2025-04-23)
  8. VINACONEX Partners with Viettel on Vietnam's Largest Data Center (Vinaconex, 2025-04-24)

Same campus, Tan Phu Trung IP (Cu Chi)

More in HCMC metro

Also run by Viettel

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.