SGI-HCM Campus (AI Data Center Complex)

Cu Chi, Ho Chi Minh City, Vietnam · HCMC metro market · location approximate to district level

SGI-HCM Campus (AI Data Center Complex) is a data center project in Cu Chi, Vietnam, operated by AIC / KinhBac City (KBC) JV. It is at the land and permitting stage. It is planned for 200 MW of IT load.

Latest change on record: entered the record as land and permitting on 21 July 2026. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
200 MW
Running now
Not disclosed
Operators rarely publish this
Operator
AIC / KinhBac City (KBC) JV
Joint venture
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and SGI-HCM Campus (AI Data Center Complex) ranks first by planned capacity. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only AIC-KBC project ArusGrid tracks. It sits on the Tan Phu Trung IP (Cu Chi) campus alongside Viettel Tan Phu Trung Data Center & High-Tech R&D Complex. Named funding comes from Accelerated Infrastructure Capital (AIC) on the equity side, VietinBank as debt and KinhBac City Development Holding (KBC). No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 50 MW is land and permitting with a 2027 target; Full campus at 200 MW is announced with a 2030 target. The stage was recorded as at the land and permitting stage on 21 July 2026. The money on record is US$2,100m as of March 2026, the announced investment. Power comes from EVN (Vietnam Electricity) through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 18 public sources for this project, the latest dated 16 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Purpose-built AI campus: 200MW IT load designed to run up to 100,000 GPUs; phase 1 50MW ~= 28,000 GPUs. No dated source yet for a signed GPU tenant or a liquid-cooling spec, so 'likely' not 'confirmed'.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 · Land and permitting50 MW, target 2027
Full campus · Announced200 MW, target 2030

Stage history

2026-07-21Land and permitting · baodautu.vn

Who is behind it

OperatorAIC / KinhBac City (KBC) JV · Joint venture
Funder, EquityAccelerated Infrastructure Capital (AIC)
Funder, Joint venture partnerKinhBac City Development Holding (KBC)
Funder, DebtVietinBank

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2026-03US$2,100m

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateKinh Bac City Development (KBC), Tan Phu Trung Industrial Park · 10 ha · Oct 2025 Reported source ↗
KBC contributes a 10 ha site in Tan Phu Trung Industrial Park. Terms not disclosed.
Industrial estateTan Phu Trung Industrial Park (operator not named in source) · 10 ha · Mar 2026 Reported source ↗
Campus spans 10 hectares in Tan Phu Trung industrial park, Cu Chi.
Power supply
Grid supplyEVN (Vietnam Electricity) · Mar 2026 Reported source ↗
EVN committed to supply power for the first phase of about 50MW IT load.

Sources checked 2026-10-21

  1. theinvestor.vn
  2. constructionreviewonline.com
  3. datacenterdynamics.com
  4. vneconomy.vn
  5. cafef.vn
  6. baochinhphu.vn
  7. danviet.vn
  8. TP HCM khoi cong Trung tam du lieu AI hon 2 ty USD dip 30/4 (VnExpress, 2026-03-11)
  9. 11 du an trung tam du lieu tai TPHCM (Dan Viet, 2026-05-07)
  10. Vietnam's data centre race draws multibillion-dollar investment (VietnamPlus, 2026-08-28)
  11. Cảng Cần Giờ, trung tâm dữ liệu lớn mang nguồn vốn FDI kỷ lục về TP.HCM (CafeF, 2026-09-25)
  12. Dòng vốn tỷ USD đổ vào cuộc đua hạ tầng số (Bao Dau tu, 2026-08-01)
  13. HCMC seeks clarification on power price for $2.1B AI data center (TNGlobal, 2026-10-16)
  14. Press release 11-03-2026 (Kinh Bac City Development Holding Corporation (KBC), 2026-03-11)
  15. Vietnam's US$2 billion AI data center to start construction in April (W.Media, 2026-03-12)
  16. Ho Chi Minh City backs $2 billion AI data centre with dedicated task force (Thời báo Tài chính Việt Nam, 2026-01-06)
  17. Bí thư Thành ủy TPHCM Trần Lưu Quang: Tạo điều kiện thuận lợi để triển khai dự án trung tâm dữ liệu AI (Sài Gòn Giải Phóng, 2026-03-11)
  18. KBC, AIC, and VietinBank to develop AI data centre in Ho Chi Minh City (iTnews Asia, 2025-11-12)

Same campus, Tan Phu Trung IP (Cu Chi)

More in HCMC metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.