CMC Hyperscale DC SHTP

Thu Duc (SHTP), Ho Chi Minh City, Vietnam · HCMC metro market · location approximate to district level

CMC Hyperscale DC SHTP is a data center project in Thu Duc (SHTP), Vietnam, operated by CMC AI Digital Infrastructure (CMC Corporation). It is at the land and permitting stage. It is planned for 30 MW of IT load.

Latest change on record: entered the record as land and permitting in July 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
30 MW
Running now
Not disclosed
Operators rarely publish this
Operator
CMC AI Digital Infrastructure (CMC Corporation)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question3 of 7 gates passed
✓ Land secured○ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Power arranged.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Vietnam approves, powers and taxes data centers is on Data center rules in Vietnam.

Where it sits

HCMC metro holds 10 active projects with 722 MW of planned IT load between them, and CMC Hyperscale DC SHTP ranks 7th by planned capacity. Of those, 2 are operational, 1 is under construction, 5 are at the land and permitting stage and 2 are announced only. Published colocation vacancy in HCMC metro was 34.8% as of June 2026, on 33 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only CMC project ArusGrid tracks. It sits on the Saigon Hi-Tech Park alongside Evolution DC VN HCMC (VN02), FPT Fornix HCM02, Gaw Capital Project Vespa and StarMason Data Centre Campus. Named funding comes from CMC Corporation on the equity side and Samsung C&T. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 at 30 MW is land and permitting with a 2027 target; Full build at 120 MW is announced. The stage was recorded as at the land and permitting stage in July 2025. The money on record is US$250m as of June 2025, a government approval ceiling.

Grid power for a large industrial user in Vietnam costs about US$0.073 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Vietnam, as of 27 September 2026, is recorded as “Licence required as enforced (Country Group D:1), no named authorisation found”. ArusGrid holds 12 public sources for this project, the latest dated 10 March 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Stated AI purpose (marketed as HCMC's 'AI heart'; AI-as-a-Service / GPU-cloud positioning). CMC already runs a GPU farm of 1,000+ Nvidia GH200 units (company PR, Jul 2025), though at its existing sites. >=100MW modern greenfield.

Access to AI chips

GradeNo public signal

Nothing found in the public record. This describes the record, not the company, and it is not evidence that access was sought or denied. Criteria are published on the Methodology page.

US licence required for this destination as enforcedYes
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

Licence required as enforced (Country Group D:1), no named authorisation found · Licence required as enforced (Country Group D:1), no named authorisation found (2026-09-27) source

Phases

Phase 1 · Land and permitting30 MW, target 2027
Full build · Announced120 MW

Stage history

2025-07Land and permitting · tuoitre.vn

Who is behind it

OperatorCMC AI Digital Infrastructure (CMC Corporation) · Colocation
Funder, EquityCMC Corporation
Funder, Joint venture partnerSamsung C&T

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Approved by a government investment agency, 2025-06US$250m

An approval figure is an incentive ceiling. It often covers a first phase and can exclude land or IT equipment.

Platform deals that include it

CMC - Samsung C&T hyperscale DC programme
Platform capital, 2025-08
US$1.0bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Vietnam, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateSaigon Hi-Tech Park · 3 ha · Jul 2024 Reported source ↗
Site of more than 3 ha in the Hi-Tech Park, Tang Nhon Phu ward. Terms not disclosed.
Industrial estateSaigon Hi-Tech Park · leased · Jul 2025 Reported source ↗
Project term is 50 years from the land allocation or land lease decision. Site is Lot T4-3 on D2 Road in SHTP, Tang Nhon Phu ward.

Sources checked 2026-10-21

  1. cmc.com.vn
  2. vir.com.vn
  3. vietnamnet.vn
  4. datacenterdynamics.com
  5. CMC va Samsung C&T ky MOU phat trien trung tam du lieu 1 ty USD (VietnamNet, 2025-08-12)
  6. TP. Hồ Chí Minh thành lập Tổ công tác hỗ trợ dự án Siêu Trung tâm dữ liệu (VnEconomy, 2025-11-25)
  7. CMC được chấp thuận là nhà đầu tư trung tâm dữ liệu 6.260 tỷ đồng tại TP.HCM (Bao Dau Tu, 2025-07-08)
  8. CMC Approved for Over USD 250 Million Investment to Build the Foundation of Vietnam's "AI Heart" (CMC Corporation, 2025-07-14)
  9. CMC opens design consulting tender for hyperscale data center project in Ho Chi Minh City (DatacenterDynamics, 2026-03-10)
  10. Billion-dollar capital seeks new opportunities in data centre real estate (Viet Nam News, 2026-01-17)
  11. TPHCM sẽ có trung tâm dữ liệu hơn 250 triệu đô la Mỹ (The Saigon Times, 2025-07-14)
  12. CMC đề xuất 3 sáng kiến nhằm thúc đẩy phát triển công nghệ vùng Đông Nam Bộ (VnEconomy, 2025-10-29)

Same campus, Saigon Hi-Tech Park

More in HCMC metro

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.