MSFusion (MegaSpeed) Bandar Cemerlang data center

Kota Tinggi (Bandar Cemerlang), Johor, Malaysia · Johor market · location approximate to city level

Also listed as MSFusion Sdn Bhd and MegaSpeed Bandar Cemerlang.

MSFusion (MegaSpeed) Bandar Cemerlang is a data center project in Kota Tinggi (Bandar Cemerlang), Malaysia, operated by MSFusion Sdn Bhd (MegaSpeed International). It is at the land and permitting stage. It is planned for 300 MW of IT load.

Record last checked against its sources on 20 October 2026.

Open on the mapSuggest a correction
Stage
Land and permitting
Planned IT load
300 MW
Running now
Not disclosed
Operators rarely publish this
Operator
MSFusion Sdn Bhd (MegaSpeed International)
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Open question2 of 7 gates passed
✓ Land secured✓ Power arranged○ Approvals granted○ Money committed○ Tenant or own use○ Builder appointed○ Construction started

Next gate to watch: Approvals granted.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and MSFusion (MegaSpeed) Bandar Cemerlang ranks third by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

It is the only MSFusion Sdn Bhd (MegaSpeed International) project ArusGrid tracks. It sits on the MSFusion BCIP campus. No user of the capacity is on the public record as of 2026-10-02, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The money on record is RM263.2m (about US$62m) as of August 2025, the announced investment. Power comes from Tenaga Nasional Berhad (TNB) through grid supply (reported, unconfirmed).

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 3 public sources for this project, the latest dated 9 September 2026, and last checked the record on 20 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Named funderNo
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

parent is GPU-cloud firm

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Who is behind it

OperatorMSFusion Sdn Bhd (MegaSpeed International) · Colocation

Who uses the compute

Checked on 2026-10-02. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2025-08RM263.2m (about US$62m)

The figure covers land only.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerCrescendo Corporation Bhd · May 2026 Reported source ↗
RHB lists MSFusion among four pending Crescendo land disposals (with Microsoft, Pioneer Real Estate, Digital Edge; ~RM1bn combined); area and price not itemised
Land sellerCrescendo Corporation Bhd · 52.544 acres · RM263.2m · freehold · Sep 2025 Reported source ↗
Bandar Cemerlang Industrial Park, RM115 psf. SPA unconditional 27 Apr 2026; balance paid Sep 2026
Land sellerCrescendo Development Sdn Bhd (Crescendo Corp Bhd) · 52.544 acres · RM263.21m · freehold · Sep 2026 Reported source ↗
RM115 per sq ft. Bandar Cemerlang Industrial Park, Kota Tinggi. SPA unconditional on 2026-04-27 and balance payment received per Bursa filing of 2026-09-09.
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · 300 MW · Sep 2025 Reported source ↗
The land sale was conditional on TNB's written confirmation of a 300MW allocation.
Grid supplyTenaga Nasional Berhad · 300 MW · Sep 2025 Reported source ↗
300MW power allocation from TNB referenced in the land sale agreement. · Applies to the whole campus.
Water and cooling
WaterMains drinking water · Ranhill SAJ Sdn Bhd · 1.06 MLD Reported source ↗
Water allocation attached to the land sale.

Sources checked 2026-10-20

  1. w.media
  2. datacentermap.com
  3. Crescendo receives balance payment for RM263m Johor data centre land sale (EdgeProp, 2026-09-09)

More in Johor

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.