STT Johor Campus

Iskandar Puteri (Gelang Patah), Johor, Malaysia · Johor market · location approximate to district level

STT Johor Campus is a data center project in Iskandar Puteri (Gelang Patah), Malaysia, operated by ST Telemedia Global Data Centres. It is under construction. It is planned for 166 MW of IT load.

Latest change on record: entered the record as under construction on 24 February 2025. Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
166 MW
Running now
Not disclosed
Operators rarely publish this
Operator
ST Telemedia Global Data Centres
Colocation
AI workloads
Confirmed
Evidence grade
Corroborated
Will it get built?Leaning yes5 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed○ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Tenant or own use.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and STT Johor Campus ranks 12th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

STT GDC has 24 projects elsewhere in the dataset tracked by ArusGrid, including STT Jakarta 7 to 9 (future phases), STT Fairview (STT GDC 'Polaris' campus) and STT GDC Bengaluru Devanahalli campus. It sits on the STT Johor (Nusa Cemerlang) campus. Named funding comes from KKR and Singtel on the equity side and UOB Malaysia, OCBC, Standard Chartered and CIMB as debt. No tenant has been disclosed, which is normal for colocation and says nothing about occupancy.

The stage was recorded as under construction on 24 February 2025. Power comes from TNB through grid supply (reported, unconfirmed). Cooling uses air cooling, with a design PUE of 1.3.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 11 public sources for this project, the latest dated 3 September 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

HPC campus, liquid-cooling support (MIDA)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

STT Johor 1 · Under construction16 MW, target 2026

Stage history

2025-02-24Under construction · sttgdc.com

Who is behind it

OperatorST Telemedia Global Data Centres · Colocation
Funder, DebtUOB Malaysia
Funder, DebtOCBC
Funder, DebtStandard Chartered
Funder, DebtCIMB
Funder, EquityKKR
Funder, EquitySingtel

Who uses the compute

No tenant disclosed. Most colocation leases are confidential, so this says nothing about occupancy. Not yet checked against second-order sources.

Money at this site

ArusGrid estimate, building costabout US$1.6bn to US$2.4bn

No figure has been announced. This range is 166 MW of planned IT load times a published benchmark of US$11.37 per watt for Malaysia, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Platform deals that include it

STT GDC S$1.75B raise (KKR-led + Singtel)
Platform capital, 2024-06
US$1.3bn
KKR + Singtel acquisition of STT GDC (platform M&A)
Platform acquisition, 2026-09-01
US$5.1bn
STT GDC Johor campus green loan
Debt, 2026-08-13
US$1.4bn

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerCrescendo Corporation (Panoramic Industrial Development) · 22.4 acres · RM117m (≈US$26m) · leasehold · Nov 2023 Confirmed source ↗
99-year leasehold on at least one parcel
Industrial estateNusa Cemerlang Industrial Park (operator not named in source) · 22 acres · Mar 2025 Reported source ↗
Campus spans over 22 acres in Nusa Cemerlang Industrial Park, Iskandar Puteri. Seller not named.
Power supply
Grid supplyTNB · Feb 2025 Reported source ↗
Renewable supply talks with Ditrolic Energy, not final
Water and cooling
CoolingAir cooled · design PUE 1.3 Confirmed source ↗
N+1 high-efficiency air-cooled chillers, N+2 fan wall units (facility factsheet)
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedLeighton Asia · Main contractor · Feb 2026 source ↗
This project is one of 3 that fit. The others are NTT Johor Bahru Campus, Princeton Digital Group JH1.

Sources checked 2026-10-22

  1. mida.gov.my
  2. datacenterdynamics.com
  3. STT GDC secures RM5.6bil financing for Johor data centre campus (New Straits Times, 2026-08-13)
  4. KKR-Singtel Consortium Completes Acquisition of STTGDC; Company Launches Refreshed Global Brand for Next Phase of Growth (STT GDC via Access Newswire, 2026-09-01)
  5. STT GDC Breaks Ground on STT Johor 1, Advancing Malaysia's Data Center Expansion (STT GDC via HPCwire, 2025-02-24)
  6. ST Telemedia Global Data Centres Breaks Ground for High-Performance Computing Data Centre Campus in Johor, Signs MOU for Talent Development (STT GDC, 2025-02-24)
  7. STT GDC begin works on data centre in Johor, Malaysia (World Construction Network, 2025-02-25)
  8. Kerjaya Prospek bags RM858mil data centre contract in Johor (The Star, 2026-09-03)
  9. Singapore Entity Secures Green Financing For Johor Data Centre Campus (Bernama, 2026-08-13)
  10. STT GDC obtains $1.37B green loan for Malaysia data center expansion (Light Reading, 2026-08-13)
  11. ST Telemedia Global Data Centres breaks ground for high-performance computing data centre campus in Johor (MIDA, 2025-02-24)

More in Johor

Also run by STT GDC

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.