Directory › Malaysia › Johor › Princeton Digital Group JH1

Princeton Digital Group JH1 data center

Sedenak (Kulai), Johor, Malaysia · Johor market · location approximate to district level

Also listed as Princeton Digital Group (PDG) Kulai and PDG Sedenak.

Princeton Digital Group JH1 is a data center project in Sedenak (Kulai), Malaysia, operated by Princeton Digital Group. It is operational and expanding. The published capacity figure is 200 MW, and its basis is not stated as IT load. The operator reports 52 MW running.

Latest change on record: moved to expanding on 4 July 2024. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
200 MW
unstated
Running now
52 MW
Operators rarely publish this
Operator
Princeton Digital Group
Colocation
AI workloads
Confirmed
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Malaysia approves, powers and taxes data centers is on Data center rules in Malaysia.

Where it sits

Johor holds 43 active projects with 4,880 MW of planned IT load between them, and Princeton Digital Group JH1 ranks 11th by planned capacity. Of those, 3 are operational, 9 are operational and expanding, 11 are under construction, 1 is past financial close, 5 are at the land and permitting stage and 14 are announced only. Published colocation vacancy in Johor was 0.7% as of June 2026, on 897 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Princeton Digital Group has 1 other in Malaysia and 7 projects elsewhere in the dataset tracked by ArusGrid, including Princeton Digital Group JH2. It sits on the PDG JH1 (Sedenak) campus. Named funding comes from Warburg Pincus, Ontario Teachers' Pension Plan and Mubadala on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 (Bldg 1) at 52 MW is operational with a 2024 target; Bldg 3 (topped out late 2025) is under construction. The dated record runs from under construction on 17 October 2023 to operational and expanding on 4 July 2024. The money on record is US$1.5bn as of July 2024, the announced investment. Power comes from Tenaga Nasional Berhad (TNB) through grid supply.

Grid power for a large industrial user in Malaysia costs about US$0.14 per kWh as of July 2025, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Malaysia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 10 public sources for this project, the latest dated 14 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalYes
Dated, sized phaseYes
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusConfirmed

AI-ready campus per operator (150MW)

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (Bldg 1) · Operational52 MW, target 2024
Bldg 3 (topped out late 2025) · Under constructionSize not published

Stage history

2023-10-17Under construction · datacenterdynamics.com
2024-07-04Expanding · mida.gov.my

Who is behind it

OperatorPrinceton Digital Group · Colocation
Funder, EquityWarburg Pincus
Funder, EquityOntario Teachers' Pension Plan
Funder, EquityMubadala

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

Announced investment, 2024-07US$1.5bn

The figure covers the whole campus.

Colocation price per kW of IT load per month

No published price band exists for Malaysia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerJLand Group Sdn Bhd (Johor Corporation) · 31 acres · May 2023 Confirmed source ↗
Sedenak Tech Park; price undisclosed (RM2bn is Phase 1 investment, not land price)
Power supply
Grid supplyTenaga Nasional Berhad (TNB) · Jul 2024 Confirmed source ↗
ESA covers entire JH1 campus capacity; Phase 1 (52MW) energised via TNB Green Lane Pathway · Applies to the whole campus.
On-site solarPrinceton Digital Group · Jul 2024 Confirmed source ↗
Rooftop solar panels; MW not stated
On-site solarJul 2024 Reported source ↗
Rooftop solar panels · Grid supply not described
Grid supplyTenaga Nasional Berhad (TNB) · Jul 2024 Confirmed source ↗
Energy supply agreement covers the entire capacity of the JH1 campus. · Applies to the whole campus.
On-site solarPrinceton Digital Group · Jul 2024 Reported source ↗
The rooftop will host solar panels.
Grid supplyNot named (utility feed) · 132kV Confirmed source ↗
Operator factsheet gives utility power supply as a highly reliable 132kV diverse power feed. The factsheet is undated and was uploaded to the PDG site in July 2024. · Applies to the whole campus.
Water and cooling
CoolingWater-cooled chillers · design PUE <1.4 Confirmed source ↗
N+1 water-cooled chiller system; 132kV diverse power feed
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedLeighton Asia · Main contractor · Feb 2026 source ↗
This project is one of 3 that fit. The others are STT Johor Campus, NTT Johor Bahru Campus.

Sources checked 2026-10-21

  1. princetondg.com
  2. datacenterdynamics.com
  3. PDG Malaysia Data Centers (Princeton Digital Group)
  4. Princeton Digital delivers Phase One of one of Southeast Asia's largest DCs in Johor (MIDA (republishing New Straits Times), 2024-07-04)
  5. JH1 Factsheet (Princeton Digital Group, 2024-07-01)
  6. PDG begins work on 150MW campus in Johor, Malaysia (DCD, 2023-10-17)
  7. Princeton Digital Group tops out third building of 200MW campus in Johor, Malaysia (DatacenterDynamics, 2025-12-10)
  8. Singapore's PDG seeks US$1.2bil loan for Malaysia data center (The Star (Bloomberg), 2026-10-14)
  9. PDG delivers first phase of Johor data center campus in Malaysia (DCD, 2024-07-04)
  10. Princeton Digital Group acquires 31 acres of land from JLand Group to develop data centre campus in Malaysia (The Edge Malaysia, 2023-05-22)

More in Johor

Also run by Princeton Digital Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.