PDG JC3, GIIC Kota Deltamas data center

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

PDG JC3, GIIC Kota Deltamas is a data center project in Cikarang, Bekasi, Indonesia, operated by Princeton Digital Group. It is under construction. It is planned for 120 MW of IT load.

Latest change on record: entered the record as under construction on 19 November 2025. Record last checked against its sources on 21 October 2026.

Open on the mapSuggest a correction
Stage
Under construction
Planned IT load
120 MW
Running now
0 MW
Operators rarely publish this
Operator
Princeton Digital Group
Colocation
AI workloads
Likely
Evidence grade
Corroborated
Will it get built?Strong6 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use○ Builder appointed✓ Construction started

Next gate to watch: Builder appointed.

Your call. Will it be built?

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and PDG JC3, GIIC Kota Deltamas ranks 10th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

Princeton Digital Group has 3 others in Indonesia and 5 projects elsewhere in the dataset tracked by ArusGrid, including PDG JC4, GIIC Bekasi, Princeton Digital Group BT1 and PDG JC1 & JC2, MM2100 Cibitung. It sits on the PDG JC3 campus. Named funding comes from DBS, HSBC, Maybank, SMBC and Standard Chartered as debt. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

The build is phased. Phase 1 (Building 1) is under construction with a Q4 2026 target; Building 2 is announced. The stage was recorded as under construction on 19 November 2025. The money on record is US$1bn as of January 2025, the announced investment. Power comes from PLN through a dedicated substation at 150 kV (reported, unconfirmed). Cooling uses direct liquid cooling.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 6 public sources for this project, the latest dated 12 October 2026, and last checked the record on 21 October 2026.

How well evidenced is it

Construction or financing is evidenced, or several independent signals agree. The rules are fixed and published on the Methodology page.

Reaching this stage requires a dated construction source, which corroborates the project on its own.

Named funderYes
Disclosed client (reported)Yes
Committed or approved capitalYes
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

PDG describes JC3 as 'flexible design tailored to support both hyperscale and AI infrastructure deployments'; 120MW modern greenfield; May 2026 financing PR says the raise was 'on the back of customer success' implying anchor hyperscale pre-lease.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (Building 1) · Under constructionSize not published, target Q4 2026
Building 2 · AnnouncedSize not published

Stage history

2025-11-19Under construction · princetondg.com

Who is behind it

OperatorPrinceton Digital Group · Colocation
Funder, DebtDBS
Funder, DebtHSBC
Funder, DebtMaybank
Funder, DebtSMBC
Funder, DebtStandard Chartered

Who uses the compute

Tenant · hyperscalerUndisclosed hyperscaler · reported, unconfirmed

Checked on 2026-10-01. No document names a confirmed user beyond the rows above.

Money at this site

Announced investment, 2025-01US$1bn

The figure covers the whole campus.

Platform deals that include it

PDG ~US$856M green financing for JC3
Debt, 2026-05
US$856m

Platform capital spans several sites. It is never added to this project's own figure.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Land sellerPT Puradelta Lestari Tbk (DMAS), GIIC Kota Deltamas · Rp171bn (≈US$11m) · 2024 Inferred by ArusGrid source ↗
Customer-level revenue from PDG in DMAS 2024 reporting
Why we think so. DMAS reported PT Princeton Digital Group as a 2024 land customer at Deltamas; PDG's only Deltamas site bought in 2024 is JC3 (JC4 land was bought in 2026).
Power supply
Dedicated substationPLN · 200 MVA · 150kV · Sep 2026 Reported source ↗
GI 150 kV Sukamahi energized, prepared to supply PDG JC3 up to 200 MVA
Grid supplyPT PLN (Persero) · Nov 2025 Reported source ↗
Dual-grid power feeds from PLN with full power capacity already contracted. Campus in GIIC, Bekasi Regency. · Applies to the whole campus.
Water and cooling
CoolingDirect liquid cooling Reported source ↗
Advanced direct-to-chip cooling.
Possibly linked
The source does not name the project, and more than one project we track fits. We show it on each of them and pin it to none.
UnconfirmedPT Total Bangun Persada Tbk · Main contractor · Sep 2025 source ↗
This project is one of 3 that fit. The others are Digital Edge CGK Campus (CGK1 to CGK4), Cikarang, PDG JC4, GIIC Bekasi.
UnconfirmedPT PLN (Persero) UIP Jawa Bagian Tengah · Grid supply · 60 MVA · May 2025 source ↗
This project is one of 3 that fit. The others are PDG JC4, GIIC Bekasi, Digital Edge CGK Campus (CGK1 to CGK4), Cikarang.

Sources checked 2026-10-21

  1. princetondg.com
  2. princetondg.com
  3. princetondg.com
  4. Singapore's Princeton Digital Group raises $856M for Indonesia data center (TNGlobal, 2026-05-07)
  5. Princeton Digital Group breaks ground on USD 1 billion, 120 MW Jakarta campus (W.Media, 2025-11-19)
  6. Princeton Digital Group Signs Definitive Agreement to Sell its Indonesia Enterprise Business to SM+ (Princeton Digital Group, 2026-10-12)

More in Greater Jakarta

Also run by Princeton Digital Group

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.