Directory › Indonesia › Greater Jakarta › NeutraDC Hyperscale DC Cikarang (HDC Cikarang)

NeutraDC Hyperscale DC Cikarang (HDC Cikarang)

Cikarang, Bekasi, West Java, Indonesia · Greater Jakarta market · location approximate to district level

NeutraDC Hyperscale DC Cikarang (HDC Cikarang) is a data center project in Cikarang, Bekasi, Indonesia, operated by NeutraDC (Telkom Data Ekosistem). It is operational and expanding. It is planned for 120 MW of IT load.

Record last checked against its sources on 22 October 2026.

Open on the mapSuggest a correction
Stage
Expanding
Planned IT load
120 MW
Running now
Not disclosed
Operators rarely publish this
Operator
NeutraDC (Telkom Data Ekosistem)
Telco
AI workloads
Likely
Evidence grade
Verified
Will it get built?Built7 of 7 gates passed
✓ Land secured✓ Power arranged✓ Approvals granted✓ Money committed✓ Tenant or own use✓ Builder appointed✓ Construction started

This project is built or running, so every gate counts as passed.

Build odds is ArusGrid's reading of the public record, not a forecast, a rating or advice. It counts the gates this project has passed in public sources. Private progress does not show, a passed gate can be undone, and projects that pass every gate still stop. The method has not yet been tested against outcomes. How it works.

How Indonesia approves, powers and taxes data centers is on Data center rules in Indonesia.

Where it sits

Greater Jakarta holds 37 active projects with 3,240 MW of planned IT load between them, and NeutraDC Hyperscale DC Cikarang (HDC Cikarang) ranks 9th by planned capacity. Of those, 12 are operational, 10 are operational and expanding, 8 are under construction, 1 is being commissioned, 1 is at the land and permitting stage, 3 are announced only and 2 are on hold. Published colocation vacancy in Greater Jakarta was 24.9% as of December 2025, on 322 MW of operational colocation capacity as counted by Cushman & Wakefield. Vacancy excludes hyperscaler self-build.

NeutraDC (Telkom) has 1 other in Indonesia tracked by ArusGrid, including NeutraDC Nxera Batam BTM-1. It sits on the NeutraDC Cikarang campus. Named funding comes from Telkom Indonesia on the equity side. No user of the capacity is on the public record as of 2026-10-01, after a check of operator, landlord, contractor, regulator and lender documents. Most colocation leases are confidential, so this says nothing about occupancy.

Power comes from PLN.

Grid power for a large industrial user in Indonesia costs about US$0.062 per kWh as of July 2026, the country figure ArusGrid applies where a site has no published rate. The US export control position for advanced AI chips in Indonesia, as of 27 September 2026, is recorded as “No US destination-based licence requirement as enforced”. ArusGrid holds 8 public sources for this project, the latest dated 2 October 2026, and last checked the record on 22 October 2026.

How well evidenced is it

Running capacity. The site is operational or expanding. The rules are fixed and published on the Methodology page.

Named funderYes
Disclosed clientNo
Committed or approved capitalNo
Dated, sized phaseNo
Three or more sourcesYes
Dated source in the last 24 monthsYes

AI workloads

StatusLikely

Operator markets it as an 'AI-ready data center' for hyperscalers and large enterprises; 120MW IT-load campus at GIIC Deltamas with 2N power houses. No rack-density/cooling disclosure.

Access to AI chips

GradeNo US licence required

This country carries no US destination-based licence requirement for advanced AI chips as the rules are enforced today. Access is a commercial matter between the project and its vendors. Criteria are published on the Methodology page.

US licence required for this destination as enforcedNo
A party headquartered in China or Macau on the projectNo
Country-level export frameworkNo
A party named in a government authorisationNo
US approved operator or confirmed client on the projectNo
Named chip-vendor partnershipNo

No US destination-based licence requirement as enforced · No US destination-based licence requirement as enforced (2026-09-27) source

Phases

Phase 1 (live since 2023) · OperationalSize not published, target 2023

Who is behind it

OperatorNeutraDC (Telkom Data Ekosistem) · Telco
Funder, EquityTelkom Indonesia

Who uses the compute

Checked on 2026-10-01. No user of this capacity is on the public record. ArusGrid read the operator's releases, the landlord's and contractors' exchange filings, regulator and lender documents and interconnection records. Most colocation leases are confidential, so this says nothing about occupancy.

Money at this site

ArusGrid estimate, building costabout US$1.1bn to US$1.7bn

No figure has been announced. This range is 120 MW of planned IT load times a published benchmark of US$11.21 per watt for Jakarta, plus or minus 15 percent, with 10 percent more at the top for liquid cooling because the project is AI-positioned. It covers the building and its mechanical and electrical plant. It excludes land, grid works, servers and fees.

Benchmark: Turner & Townsend Data Centre Construction Cost Index 2025, as reported by Data Storage Asia. An estimate is never added to any total on the site.

Colocation price per kW of IT load per month

No published price band exists for Indonesia, and ArusGrid does not estimate from the regional benchmark alone. What was searched is listed on the Colo prices page.

Land
Industrial estateGIIC Deltamas (Greenland International Industrial Center, Kota Deltamas) · 65,000 sqm · Jun 2021 Confirmed source ↗
Telkom says the campus is built on about 65,000 sqm. NeutraDC's site page places it at GIIC Deltamas, Cikarang.
Power supply
Power allocation or planPLN · 200 MW · Aug 2026 Confirmed source ↗
MoU with PLN for power to expand NeutraDC Cikarang to 200 MW; no MVA stated
Grid supplyPT PLN (Persero), UID Jawa Barat and PLN Electricity Services · 200 MW · Aug 2026 Confirmed source ↗
MoU signed in Bandung; no MVA or substation disclosed.
Power allocation or planPertamina Power Indonesia (PPI) · Jan 2024 Confirmed source ↗
Operator says Cikarang uses renewable energy in collaboration with PPI. The instrument (REC, PPA or other) and the volume are not stated. Renewable energy supply for the Cikarang data centre

Sources checked 2026-10-22

  1. neutradc.com
  2. datacentermap.com
  3. NeutraDC dan PLN Perkuat Data Center Cikarang hingga 200 MW (KabarBursa, 2026-08-14)
  4. Sinergi Danantara, NeutraDC, dan PLN Siapkan Data Center 200 MW (Katadata, 2026-08-14)
  5. 8 Data Center AI di Indonesia: DCI, BDx, EDGE, hingga NeutraDC (Bisnis, 2026-10-02)
  6. NeutraDC Gandeng PLN, Siapkan Ekspansi Hyperscale Data Center hingga 200 MW (Investortrust, 2026-08-16)
  7. Telkom HDC Topping-off , The Largest International Data Center is Coming Soon in Indonesia (Telkom Indonesia, 2021-06-09)
  8. The Road to neuCentrIX HyperScale Data Center: Topping-Off Ceremony (neuCentrIX (Telkom), 2021-06-15)

More in Greater Jakarta

Also run by NeutraDC (Telkom)

Planned MW is IT load, the power available to servers, unless marked otherwise. Running capacity is rarely published, so a missing figure means undisclosed. Definitions, sourcing standards and evidence rules are on the Methodology page. Data is CC BY-NC 4.0. Corrections go to corrections@arusgrid.com. Dataset updated 2026-10-18.